共 50 条
- [1] Artifacts Found During Quality Assurance Testing of Computed Radiography and Digital Radiography Detectors [J]. Journal of Digital Imaging, 2009, 22 : 383 - 392
- [3] IMPLEMENTATION OF QUALITY ASSURANCE DURING CONSTRUCTION [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 22 (NOV16): : 527 - 528
- [5] AECS INSPECTION PROGRAM FOR QUALITY ASSURANCE DURING CONSTRUCTION [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1969, 12 (01): : 177 - &
- [7] Combined performance tests before installation of the ATLAS Semiconductor and Transition Radiation Tracking Detectors [J]. JOURNAL OF INSTRUMENTATION, 2008, 3
- [8] Quality assurance and quality control of nuclear engineering during construction phase [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2007, 28 (02): : 101 - 104