Quality assurance and testing before, during, and after construction of semiconductor tracking detectors

被引:3
|
作者
Runolfsson, O
机构
[1] CERN
关键词
D O I
10.1016/S0168-9002(96)00618-3
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
We discuss the most frequent problems met with during the construction of three generations of microvertex detectors and a silicon-tungsten luminometer for the OPAL experiment, and during the many small projects and R&D work for other experiments and university projects. The emphasis will be on describing technical details and work practices adopted to prevent damage to and loss of expensive material, and the techniques preferred to prevent disaster during construction.
引用
收藏
页码:223 / 228
页数:6
相关论文
共 50 条
  • [1] Artifacts Found During Quality Assurance Testing of Computed Radiography and Digital Radiography Detectors
    Ian D. Honey
    Alistair Mackenzie
    [J]. Journal of Digital Imaging, 2009, 22 : 383 - 392
  • [2] Artifacts Found During Quality Assurance Testing of Computed Radiography and Digital Radiography Detectors
    Honey, Ian D.
    Mackenzie, Alistair
    [J]. JOURNAL OF DIGITAL IMAGING, 2009, 22 (04) : 383 - 392
  • [3] IMPLEMENTATION OF QUALITY ASSURANCE DURING CONSTRUCTION
    MCMAHON, VP
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 22 (NOV16): : 527 - 528
  • [4] QUALITY ASSURANCE OF GELCARDS MULTIPLY CENTRIFUGED BEFORE USED FOR TESTING
    Strobel, E.
    Betten, S.
    [J]. VOX SANGUINIS, 2010, 99 : 338 - 338
  • [5] AECS INSPECTION PROGRAM FOR QUALITY ASSURANCE DURING CONSTRUCTION
    KORNBLIT.L
    REINMUTH, GW
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1969, 12 (01): : 177 - &
  • [6] Quality Assurance of Gelcards Centrifuged Multiple Times Before Use for Testing
    Strobel, Erwin
    Betten, Sandra
    [J]. CLINICAL LABORATORY, 2014, 60 (02) : 329 - 331
  • [7] Combined performance tests before installation of the ATLAS Semiconductor and Transition Radiation Tracking Detectors
    Abate, E.
    Abdesselam, A.
    Addy, T. N.
    Akesson, T. P. A.
    Allport, P. P.
    Andricek, L.
    Anghinolfi, F.
    Apsimon, R.
    Arik, E.
    Arik, M.
    Austin, N.
    Baker, O. K.
    Banas, E.
    Bangert, A.
    Barbier, G.
    Baron, S.
    Barr, A. J.
    Basiladze, S.
    Batchelor, L. E.
    Bates, R. L.
    Batley, J. R.
    Battistin, M.
    Beck, G. A.
    Beddall, A.
    Beddall, A. J.
    Bell, P. J.
    Bell, W. H.
    Belymam, A.
    Benjamin, D. P.
    Bernabeu, J.
    Bertelsen, H.
    Bethke, S.
    Bingul, A.
    Bitadze, A.
    Bizzell, J. P.
    Blocki, J.
    Bocci, A.
    Bochenek, M.
    Bohm, J.
    Bondarenko, V. G.
    Bonneau, P.
    Booth, C. N.
    Brandt, O.
    Brochu, F. M.
    Broklova, Z.
    Broz, J.
    de Renstroman, P. A. Bruckman
    Burdin, S.
    Buttar, C. M.
    Garrido, M. Capeans
    [J]. JOURNAL OF INSTRUMENTATION, 2008, 3
  • [8] Quality assurance and quality control of nuclear engineering during construction phase
    Zhang, Zhi-Hua
    Deng, Yue
    Liu, Yao-Guang
    Xu, Xian-Qi
    Zhou, Shan
    Qian, Da-Zhi
    Zhang, Yang
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2007, 28 (02): : 101 - 104
  • [9] Quality Assurance of Plan Parameter Integrity before and during Treatment
    Furhang, E.
    Kim, C.
    Sillanpaa, J.
    Harrison, L.
    [J]. MEDICAL PHYSICS, 2010, 37 (06)
  • [10] Improvements of quality assurance testing program for subgrade and base layer construction
    Rouzmehr, Fouzieh
    Choi, Pangil
    Nam, Jeong Hee
    Won, Moon
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2021, 310