Fuzzy synthetic evaluation of human resource management practices influencing construction labour productivity

被引:19
|
作者
Gurmu, Argaw Tarekegn [1 ]
机构
[1] Deakin Univ, Sch Architecture & Built Environm, Fac Sci Engn & Built Environm, Geelong, Vic, Australia
关键词
Human resource management practices; Building projects; Construction; Labour productivity; Fuzzy synthetic evaluation; PERCEPTIONS; PROJECTS; CONTRACTORS; PERFORMANCE; DRIVERS; WORKERS;
D O I
10.1108/IJPPM-04-2019-0198
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The main objective of this research is to identify the most important human resource management (HRM) practices, which have the potential to enhance labour productivity using fuzzy synthetic evaluation approach. Design/methodology/approach The study used a mixed-methods research design in which qualitative data were collected and analysed during Phase I and quantitative data were analysed during Phase II. Nineteen experts who have experience in building construction projects were involved in interviews conducted in Phase I. During Phase II, quantitative data were collected from contractors that were involved in the delivery of building projects using questionnaires and the data were analysed using FSE technique. Findings Clear delegation of responsibility, stability of organisational structure and crew composition are found to be the three most important HRM practices that can enhance productivity in building construction projects. The findings of the study showed that the overall importance index computed using the FSE model is 3.65 (approximate to 4) with an equivalent linguistic term of "very important". The study also suggested that the top three HRM practices should be implemented conjointly as there is no significant difference among their weights. Originality/value The output of this research can provide important information regarding the HRM practices in the Australian construction industry. Thus, international developers or contractors who want to do construction business in Australia can implement the essential HRM practices so that the productivity of their construction projects will not be affected negatively.
引用
收藏
页码:256 / 276
页数:21
相关论文
共 50 条
  • [1] Application of Fuzzy Synthetic Evaluation Model in Human Resource Management
    Guo Ming-liang
    Hang Xiao-mei
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (5TH), VOL II, 2009, : 882 - 887
  • [2] Human resource management impacts on labour productivity in tourism
    Li, X. Penny
    Joppe, Marion
    Meis, Scott M.
    [J]. TOURISM ECONOMICS, 2017, 23 (05) : 1028 - 1041
  • [3] Predicting Construction Labor Productivity Based on Implementation Levels of Human Resource Management Practices
    Gurmu, Argaw Tarekegn
    Ongkowijoyo, Citra S.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (03)
  • [4] Fuzzy synthetic evaluation on layoff mechanism for human resource
    雷勇
    [J]. Journal of Chongqing University(English Edition), 2004, (02) : 63 - 65
  • [5] Evaluation of Human Factors Influencing Labor Productivity in Construction Project
    Tammy, Nor Janna
    Medani, Muhammad Mazasry
    Ramli, Rozaini
    Yunus, Juzailah Nur
    Noor, Raja Nor Husna Raja Mohd
    [J]. PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 1549 - 1561
  • [6] Factors Influencing Construction Labour Productivity: An Indian Case Study
    Thomas, Anu V.
    Sudhakumar, J.
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2014, 19 (01) : 53 - 68
  • [7] Classifying and evaluating enablers influencing modular construction utilization in the construction sector: A fuzzy synthetic evaluation
    Ali, Ali Hassan
    Kineber, Ahmed Farouk
    Qaralleh, Thikryat Jibril Obied
    Alaboud, Naif Sultan
    Daoud, Ahmed Osama
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2023, 78 : 45 - 55
  • [8] Factors influencing labour productivity in Bahrain's construction industry
    Jarkas, Abdulaziz M.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2015, 15 (01) : 94 - 108
  • [9] Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation
    Xie, Wenwen
    Deng, Binchao
    Yin, Yilin
    Lv, Xindong
    Deng, Zhenhua
    [J]. BUILDINGS, 2022, 12 (11)
  • [10] Construction materials management practices enhancing labour productivity in multi-storey building projects
    Gurmu, Argaw Tarekegn
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (01) : 77 - 86