Scheduling automated transport vehicles for material distribution systems

被引:39
|
作者
Rahman, Humyun Fuad [1 ]
Nielsen, Izabela [2 ]
机构
[1] Univ New South Wales, Sch Engn & IT, Canberra, ACT, Australia
[2] Aalborg Univ, Dept Mat & Prod, Aalborg, Denmark
关键词
ATV scheduling; Material distribution; Genetic algorithm; Iterated greedy algorithm; ITERATED GREEDY ALGORITHM; GUIDED VEHICLES; MACHINES; TIME; SELECTION; MINIMIZE; ROBOT; AGVS;
D O I
10.1016/j.asoc.2019.105552
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The rise of advanced manufacturing technology has led to enhanced, efficient material handling equipment in manufacturing and container terminal environments. In order to exploit the full potential of advanced material handling equipment in real-world industrial environments, novel scheduling approaches capable of ensuring integrated operations for multiple automated transport vehicles need to be developed. This research develops a methodology for scheduling automated transport vehicles to ensure the smooth flow of materials in production and container terminal environments. The procedure consists of a mixed-integer programming model and two meta-heuristic-based algorithms that are proposed to achieve quality schedules within a reasonable amount of time. The obtained results show a significant reduction in the earliness or lateness of material delivery tasks and an improvement in operational performance, demonstrating that the proposed approaches are capable of ensuring smooth material distribution by scheduling automated transport vehicles in an integrated manner. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Job Shop Scheduling with Transport by Automated Guided Vehicles
    Smutnicki, Czeslaw
    Pempera, Jaroslaw
    16TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS (SOCO 2021), 2022, 1401 : 789 - 799
  • [2] Scheduling Automated Guided Vehicles considering transport load transfers
    Boden P.
    Rank S.
    Schmidt T.
    Logistics Research, 2023, 16 (01)
  • [3] Intelligent transport systems towards automated vehicles
    Oyama, Satoshi
    ITU News, 2019, 2019 (04): : 29 - 32
  • [4] AGV scheduling for automated material distribution: a case study
    Namita Singh
    P. V. Sarngadharan
    Prabir K. Pal
    Journal of Intelligent Manufacturing, 2011, 22 : 219 - 228
  • [5] AGV scheduling for automated material distribution: a case study
    Singh, Namita
    Sarngadharan, P. V.
    Pal, Prabir K.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (02) : 219 - 228
  • [6] Scheduling vehicles in automated transportation systems - Algorithms and case study
    van der Heijden, M
    Ebben, M
    Gademann, N
    van Harten, A
    OR SPECTRUM, 2002, 24 (01) : 31 - 58
  • [7] DYNAMIC SCHEDULING OF AUTOMATED GUIDED VEHICLES FOR A CERTAIN CLASS OF SYSTEMS
    JAIKUMAR, R
    SOLOMON, MM
    JOURNAL OF MANUFACTURING SYSTEMS, 1990, 9 (04) : 315 - 323
  • [8] Scheduling of Multi-load Automated Guided Vehicles for Material Distribution Based on Multi-stage Auction Algorithm
    Guan, Jianfeng
    Qiu, Zhifeng
    Zhou, Ying
    Yu, Jingrong
    Li, Lijiao
    Gui, Weihua
    2018 13TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2018, : 1419 - 1424
  • [9] INTEGRATED SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEMS EMPLOYING AUTOMATED GUIDED VEHICLES
    LEE, DY
    DICESARE, F
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 1994, 41 (06) : 602 - 610
  • [10] Automated vehicles and electrification of transport
    Offer, Gregory James
    ENERGY & ENVIRONMENTAL SCIENCE, 2015, 8 (01) : 26 - 30