Customer lead time management when both demand and price are lead time sensitive

被引:151
|
作者
Ray, S
Jewkes, EM [1 ]
机构
[1] Univ Waterloo, Dept Management Sci, Waterloo, ON N2L 3G1, Canada
[2] McGill Univ, Fac Management, Montreal, PQ H3A 1G5, Canada
关键词
delivery time strategy; investment and capacity analysis; economics of queues;
D O I
10.1016/S0377-2217(02)00655-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we model an operating system consisting of a firm and its customers, where the mean demand rate is a function of the guaranteed delivery time offered to the customers and of market price, where price itself is determined by the length of the delivery time. Economies of scale are present. The firm's objective is to maximize profits by selecting an optimal guaranteed delivery time taking into account that (i) reducing delivery time will require investment, and (ii) the firm must be able to satisfy a pre-specified service level. We show that it is imperative for managers to know whether customers are price or lead time sensitive based on the simultaneous dependence of price and demand on delivery time before selecting a time-based competitive strategy. We investigate the optimal policy and provide managerial insights based on our analysis. Examples where our insights are consistent with actual practical situations are also provided. We show that our model is different from those in the literature that assume price and delivery time to be independent decision variables and present conditions under which ignoring the relation between price and delivery time can lead managers to substantially sub-optimal decisions-with or without the presence of economies of scale. (C) 2002 Elsevier B.V. All rights reserved.
引用
收藏
页码:769 / 781
页数:13
相关论文
共 50 条
  • [1] Capacity and lead-time management when demand for service is seasonal and lead-time sensitive
    Thanh-Ha Nguyen
    Wright, Mike
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 247 (02) : 588 - 595
  • [2] Lot sizing, pricing and lead time decisions with time and price sensitive demand
    Shao Jian-jun
    Ke Da-gang
    [J]. APSCC: 2006 IEEE ASIA-PACIFIC CONFERENCE ON SERVICES COMPUTING, PROCEEDINGS, 2006, : 130 - +
  • [3] Supply chain disruptions management when both demand and price are response time sensitive
    Gao, Bo
    Shi, Shu-Sheng
    Wei, Shi-Yun
    [J]. Kongzhi yu Juece/Control and Decision, 2011, 26 (09): : 1363 - 1366
  • [4] Inventory and lead time planning with lead-time-sensitive demand
    Yang, Bibo
    Geunes, Joseph
    [J]. IIE TRANSACTIONS, 2007, 39 (05) : 439 - 452
  • [5] Lead Time Decisions under lead-time sensitive demand with demand disruptions
    Lin, Ching-Pin
    Hsieh, Chung-Chi
    [J]. 2009 6TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT, VOLS 1 AND 2, 2009, : 331 - +
  • [6] Impact of lead-time decision in a decentralized supply chain under price and lead-time sensitive demand
    Sediri, Ibtinen
    Nakade, Koichi
    [J]. Journal of Japan Industrial Management Association, 2011, 62 (03) : 125 - 134
  • [7] Lead-Time-contingent Pricing under Time and Price Sensitive Demand in Electronic Markets
    Yang Wen-sheng
    Li Li
    [J]. 2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 4306 - +
  • [8] Centralized versus Decentralized Competition for Price and Lead-Time Sensitive Demand
    Pekguen, Pelin
    Griffin, Paul M.
    Keskinocak, Pinar
    [J]. DECISION SCIENCES, 2017, 48 (06) : 1198 - 1227
  • [9] A solution for the intractable inventory model when both demand and lead time are stochastic
    Hayya, Jack C.
    Harrison, Terry P.
    Chatfield, Dean C.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 122 (02) : 595 - 605
  • [10] Lead time and capacity decision-making based on demand is lead time sensitive
    Xie, Xiang-Tian
    Zhang, Bi-Xi
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (09): : 2242 - 2250