The acute lack of natural water resources in Kuwait is indisputable. The country essentially has one limited natural water resource that is groundwater, while the majority of the country's demands are met by seawater desalination. Notwithstanding this scarcity calls for careful foresighted utilization of the water resources, no clear plans is being followed. Attempting to initiate the planning process, this paper gives an assessment of the current status of water resources availability, production, future demand and expected increases in production, in Kuwait. While the desalination and wastewater reuse are only bounded by economical considerations, considerable efforts have already been made in assessing the baseline of the groundwater resources in Kuwait; nonetheless, no estimation is available of the aquifer system potential for sustainable development or even mining. The total water budget in 2001 is estimated at 655 Million m(3), with desalination, groundwater production, and wastewater reuse constituting 59%, 32% and 9% respectively. The projected water demand for 2010 is 1020 Million m(3). The plans of the Ministry of Electricity and Water and the Ministry of Public Works indicated that groundwater would cover 52% of the planned additional production, while desalination and wastewater reuse would cover 44% and 4% respectively. While the proposed increase in groundwater production would inevitably consume the only natural water resource of the country, only 40% of the generated wastewater is to be utilized. The absence of integrated planning is also manifested in the total planned production that surpasses the projected demands by more than 17%.