Sustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach

被引:10
|
作者
Foroutan Mirhosseini, Ali [1 ,2 ]
Pitera, Kelly [1 ]
Odeck, James [1 ,3 ]
Welde, Morten [1 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, N-7491 Trondheim, Norway
[2] Norwegian Publ Roads Adm, N-7075 Tiller, Norway
[3] Norwegian Publ Roads Adm, N-0609 Oslo, Norway
关键词
cost overrun; PLS-SEM; project management; sustainability; Norway; INFRASTRUCTURE PROJECTS; EMPIRICAL-EVIDENCE; OVERRUNS; CONSTRUCTION; DECISION; INVESTMENTS; QUALITY; DELAYS; REWORK; ROADS;
D O I
10.3390/su14020960
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Determining the factors leading to cost inaccuracy in infrastructure projects relates to sustainability by improving the cost performance of the projects (economic sustainability) and reducing the waste of available resources (environmental sustainability). This study investigates the effects of various factors affecting the cost performance of large-scale road projects in Norway in both the planning and construction phases. To this aim, a quantitative approach using a questionnaire survey was employed to understand the attitude of practitioners towards various factors causing cost increases. An advanced multivariate statistical approach of Partial Least Square Structural Equation Modeling (PLS-SEM) and Relative Importance Index (RII) was utilized to analyze the questionnaire responses. The results of the RII analysis show that local wishes, defective estimations, and long processing times had the most impact on the cost increase during the planning phase. At the same time, scope changes, market conditions, and unforeseen ground conditions were the most influential parameters in the construction phase. Moreover, the results obtained from PLS-SEM reveal that external related factors had the most influence among the other grouped factors (i.e., pre-construction, project management and contractual relationship, contractor's site management, and external) on cost overrun during the construction phase. Increasing the knowledge of these factors will allow for developing relevant project management approaches targeted at improving economic and environmental sustainability within both the planning and construction phases.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Impact of Overcoming BIM Implementation Barriers on Sustainable Building Project Success: A PLS-SEM Approach
    Kineber, Ahmed Farouk
    Massoud, Mostafa Mo.
    Hamed, Mohammed Magdy
    Alhammadi, Yasir
    Al-Mhdawi, M. K. S.
    [J]. BUILDINGS, 2023, 13 (01)
  • [2] Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
    Yap, Jeffrey Boon Hui
    Abdul-Rahman, Hamzah
    Wang, Chen
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (05)
  • [3] Sustainable entrepreneurship in the equestrian sector through horse manure: a PLS-SEM approach
    Lupoae, Oana Daniela
    Radu, Riana Iren
    Isai, Violeta Maria
    Mihai, Oana Iuliana
    [J]. INTERNATIONAL JOURNAL OF ENTREPRENEURIAL BEHAVIOR & RESEARCH, 2023, 29 (07): : 1497 - 1515
  • [4] Exploring the Sustainable Delivery of Building Projects in Developing Countries: A PLS-SEM Approach
    Kineber, Ahmed Farouk
    Hamed, Mohammed Magdy
    [J]. SUSTAINABILITY, 2022, 14 (22)
  • [5] The Structural of Effective Materials Management Factors Model: A PLS-SEM Approach
    Jusoh, Zairra Mat
    Kasim, Narimah
    Dodo, Mansir
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (01): : 110 - 119
  • [6] Assessing Low-Cost Housing Demand in Melaka: PLS-SEM Approach
    Zainun, Noor Yasmin
    Roslan, Nadzirah
    Memon, Aftab Hameed
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 3156 - 3162
  • [7] Impact of supervisory behavior on sustainable employee performance: Mediation of conflict management strategies using PLS-SEM
    Min, Jiang
    Iqbal, Shuja
    Khan, Muhammad Aamir Shafique
    Akhtar, Shamim
    Anwar, Farooq
    Qalati, Sikandar Ali
    [J]. PLOS ONE, 2020, 15 (09):
  • [8] Rationalizing the Implementation of Web-Based Project Management Systems in Construction Projects Using PLS-SEM
    Doloi, Hemanta
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
  • [9] Modeling firm resources - enterprise risk management relationships An empirical finding using PLS-SEM
    Abd Razak, Noraznira
    Ab Rahman, Zuriah
    Borhan, Halimahton
    [J]. WORLD JOURNAL OF ENTREPRENEURSHIP MANAGEMENT AND SUSTAINABLE DEVELOPMENT, 2016, 12 (01) : 35 - 49
  • [10] Cost Deviation Model of Construction Projects in Saudi Arabia Using PLS-SEM
    Alsugair, Abdullah M.
    [J]. SUSTAINABILITY, 2022, 14 (24)