Project Management System Implementation in SMEs: A Case Study

被引:0
|
作者
Alves, Pedro Raposo [1 ]
Tereso, Anabela [1 ]
Fernandes, Gabriela [1 ]
机构
[1] Univ Minho, Guimaraes, Portugal
关键词
Project Management System; a Project Management Information System; SME;
D O I
暂无
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
This paper aims to describe the implementation of a Project Management System (PMS), supported by a Project Management Information System (PMIS) in a SME. The implemented PMS was designed to be flexible in order to support the different organization's business areas that have different types of projects requiring different project management (PM) approaches. Therefore, a hybrid model was implemented, merging traditional with agile PM practices, and thus achieving the flexibility demanded by the organization, without unsettle projects planning. After implementing the PMIS, several difficulties were experienced with the embedding process. It was felt the system implemented was too complex for the organization's PM maturity, and that it would be necessary to re-evaluate the scope of this implementation. So, difficulties, failures and successes experienced are presented, as well as improvement actions that may facilitate the embedment of the PMS in the organization. The conclusion was that the main problems were related to the complexity of some PMIS requirements, associated with more formal PM practices, and with the range of the initial dissemination of the system. Therefore, it was suggested a revision of the PMS to become less complex, and a new embedding approach, more realistic and measurable.
引用
收藏
页码:8322 / 8332
页数:11
相关论文
共 50 条
  • [1] PROBLEMS OF PROJECT MANAGEMENT IMPLEMENTATION IN SMES
    Alan, P.
    Negrut, M.
    [J]. MANAGEMENT OF TECHNOLOGICAL CHANGES, VOL 2, 2009, : 391 - 392
  • [2] AN EMPIRICAL STUDY ON THE IMPLEMENTATION OF PROJECT RISK MANAGEMENT IN SPANISH SMES
    Lima, Ferreira de Araujo Priscila
    Marcelino-Sadaba, Sara
    Echeverria-Lazcano, Angel Maria
    Verbano, Chiara
    [J]. BUSINESS MANAGEMENT THEORIES AND PRACTICES IN A DYNAMIC COMPETITIVE ENVIRONMENT, 2019, : 1635 - 1638
  • [3] A system implementation study: management commitment to project management
    Marble, RP
    [J]. INFORMATION & MANAGEMENT, 2003, 41 (01) : 111 - 123
  • [4] Project management: a case study of a successful ERP implementation
    Carton, Fergal
    Adam, Frederic
    Sammon, David
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (01) : 106 - 124
  • [5] Role negotiation and interaction: An exploratory case study of the impact of management consultants on ERP system implementation in SMEs in Taiwan
    Chen, Ruey-Shun
    Sun, Chia-Ming
    Helms, Marilyn M.
    Jih, Wen-Jang Kenny
    [J]. INFORMATION SYSTEMS MANAGEMENT, 2008, 25 (02) : 159 - 173
  • [6] Project portfolio management in a company strategy implementation, a case study
    Hyvari, Irja
    [J]. SELECTED PAPERS FROM THE 27TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), 2014, 119 : 229 - 236
  • [7] Knowledge Management Implementation in SMEs: A Framework and a Case Illustration
    Daghfous, Abdelkader
    Kah, Muhammadou
    [J]. JOURNAL OF INFORMATION & KNOWLEDGE MANAGEMENT, 2006, 5 (02) : 107 - 115
  • [8] An Intranet based system as an enabler in effective project management and implementation of quality standards: A case study
    Hussain, Zahid
    Barber, Kevin
    Hussain, Naveed
    [J]. JOURNAL OF ENGINEERING AND TECHNOLOGY MANAGEMENT, 2009, 26 (03) : 196 - 210
  • [9] A Case Study of Performance Management System Implementation
    Striteska, Michaela
    Sadska, Veronika
    [J]. INNOVATION MANAGEMENT AND SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO GLOBAL GROWTH, VOLS I - VI, 2015, 2015, : 1561 - 1568
  • [10] Implementation of an Operations Management System in eight Spanish SMEs
    Jose Gonzalez, Ma
    Martin, Enrique
    Buiza, Gracia
    Hidalgo, Manuel
    Beltran, Jaime
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1296 - 1302