Integrated Dispatching Model of Automated Lifting Vehicles, Quay Cranes and Yard Cranesat Automated Container Terminal

被引:5
|
作者
Sadeghian, S. H. [1 ]
Ariffin, M. K. A. M. [1 ]
Tang, S. H. [1 ]
Ismail, N. [1 ]
机构
[1] Univ Putra Malaysia, Fac Engn, Dept Mech & Mfg Engn, Serdang 43400, Malaysia
关键词
Integrated scheduling; Quay crane; ALV; Yard Crane; Limited buffer space;
D O I
10.4028/www.scientific.net/AMM.564.678
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Integration of various types of handling equipment is one of the important methods to improve the efficiency of processes and productivity of a container terminal. Using ALVs, because of their ability in lifting a container from the ground by themselves, can reduce the delay of loading and unloading tasks in automatic container terminals. In this paper, a mixed-integer programming model, which considers the integration of ALVs, Quay Cranes and Yard Cranes, is developed. This model minimizes the makespan of the loading and unloading activities in an Automatic Container Terminal with limited buffer spaces.
引用
收藏
页码:678 / 683
页数:6
相关论文
共 50 条
  • [1] A comprehensive review and directions for future research on the integrated scheduling of quay cranes and automated guided vehicles and yard cranes in automated container terminals
    Naeem, Doaa
    Gheith, Mohamed
    Eltawil, Amr
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 179
  • [2] Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
    Naeem, Doaa
    Eltawil, Amr
    Iijima, Junichi
    Gheith, Mohamed
    [J]. LOGISTICS-BASEL, 2022, 6 (04):
  • [3] A New Dispatching Model of Automated Lifting Vehicles in Automated Container Terminal with Limited Buffer Space
    Sadeghian, Seyed Hamidreza
    Ariffin, Mohd Khairol Anuar bin Mohd
    Hong, Tang Sai
    Ismail, Napsiah Bt
    [J]. ADVANCED RESEARCH IN MATERIAL SCIENCE AND MECHANICAL ENGINEERING, PTS 1 AND 2, 2014, 446-447 : 1334 - 1339
  • [4] Noisy Optimization of Dispatching Policy for the Cranes at the Storage Yard in an Automated Container Terminal
    Kim, Jeongmin
    Hong, Ellen J.
    Yang, Youngjee
    Ryu, Kwang Ryel
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (15):
  • [5] Integrated optimization model for automated lifting vehicles scheduling and yard allocation at automated container terminals
    International College, Dalian University, Dalian
    116622, China
    不详
    116026, China
    [J]. Xitong Gongcheng Lilum yu Shijian, 5 (1349-1359):
  • [6] Scheduling of automated guided vehicles for tandem quay cranes in automated container terminals
    Kong, Lingrui
    Ji, Mingjun
    Yu, Anxu
    Gao, Zhendi
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2024, 163
  • [7] A dispatching method for automated lifting vehicles in automated port container terminals
    Nguyen, Vu Duc
    Kim, Kap Hwan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) : 1002 - 1020
  • [8] Dispatching Rules for Scheduling Twin Automated Gantry Cranes in an Automated Railroad Container Terminal
    Peng Guo
    Limin Wang
    Cong Xue
    Yi Wang
    [J]. Arabian Journal for Science and Engineering, 2020, 45 : 2205 - 2217
  • [9] Dispatching Rules for Scheduling Twin Automated Gantry Cranes in an Automated Railroad Container Terminal
    Guo, Peng
    Wang, Limin
    Xue, Cong
    Wang, Yi
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2020, 45 (03) : 2205 - 2217
  • [10] Simultaneous Allocation and Scheduling of Quay Cranes, Yard Cranes, and Trucks in Dynamical Integrated Container Terminal Operations
    Cahyono, Rully Tri
    Kenaka, Saskia Puspa
    Jayawardhana, Bayu
    [J]. IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (07) : 8564 - 8578