Rehabilitation and direct firing conversion of Mongolia coal fired boilers

被引:0
|
作者
Longoni, C
Testa, R
Costa, G
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In October 1995 ABB CE SpA was awarded with the Order for the Rehabilitation of Power Plans No. 3 in Ulaanbantar. The Scope of Work consists in the rehabilitation of No. 5 coal firing boilers having each a steam capacity of 220 t/h: conversion of the firing system from indirect to direct, new design of economizer and tubular air pre-heater and rite replacement of other pressure parts (water wall and superheater). The Project is financed by a sofi loan of ADB (Asian Development Bank). The first two units completed the rehabilitation and are in operation since spring 1998. The other units rehabilitation is in progress.