Lifting and transportation in high-rise building construction in Japan: the beginning of integrated lifting and transportation and recent developments

被引:1
|
作者
Gondo, Tomoyuki [1 ]
Miura, Reiji [1 ]
Kurosaka, Masato [2 ]
机构
[1] Univ Tokyo, Dept Architecture, Bldg Construct Management Lab, Tokyo, Japan
[2] Tokyo Metropolitan Univ, Dept Architecture, Tokyo, Japan
关键词
Lifting and transportation; high-rise building; construction system; transition; construction site;
D O I
10.1080/13467581.2020.1758109
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Lifting and transportation (LT) directly affects construction costs and timetables for high-rise buildings. Recently in Japan, the occupation of professional lifting and transportation subcontractor (PLTS) was established, and the LT construction system has evolved into an integrated lifting and transportation (ILT) system. In the ILT system, PLTSs (rather than general contractors) manage the entirety of LT during construction. However, this change in LT systems since the beginning of high-rise building construction has not been investigated. For the improvement of LT management or productivity, this study aims to clarify the development process of LT and explore recent developments and problems in ILT in high-rise building construction via literature surveys, interviews, questionnaires, and surveys on construction sites. The findings are as follows: First, following an increase in workers' wages in the 1990s, several PLTSs started working exclusively on LT, and during the 2000s, PLTSs began to manage all LT on construction sites. Second, most PLTS companies are small and have difficulty training workers, and the scope of LT work is not clear. Third, this paper clarifies the types of LT and several LT problems found on construction sites that are caused by a lack of communication between general contractors and PLTSs.
引用
收藏
页码:502 / 514
页数:13
相关论文
共 50 条
  • [1] Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction
    Park, Moonseo
    Ha, Sungbong
    Lee, Hyun-Soo
    Choi, Yoon-Ki
    Kim, Hyunsoo
    Han, Sangwon
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 32 : 88 - 95
  • [2] Calculation & Analysis on Integral Mound-lifting System of Shear Wall Construction in High-rise Building
    Wang, Fan
    Zeng, Yunsheng
    [J]. PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 770 - 775
  • [3] Study on Selection and Optimization of Vertical Transportation Equipment for High-rise Construction
    Qi, Xijing
    Zhou, Xiaohu
    Song, Mingliang
    Li, Fengming
    [J]. ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 168-170 : 2376 - +
  • [4] Discussion on construction checking calculation of high-rise precast shear panel during lifting
    Liu, Jimin
    Yu, Hui
    Xu, Pingfan
    [J]. 2018 INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURE AND DISASTER PREVENTION, 2019, 218
  • [5] Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction
    Hyun, Hosang
    Park, Moonseo
    Lee, Dowan
    Lee, Jeonghoon
    [J]. BUILDINGS, 2021, 11 (03)
  • [6] Mold-unloading-lifting and Lifting-transportation's Construction Checking of Composite Wallboard in Industrial Production
    Xu, Chunyi
    Yan, Lei
    Xu, Chunlei
    Jiang, Shikai
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2285 - +
  • [7] A Prediction Method of Vertical Lifting Loads based on Long-Term Time Series Analysis for High-Rise Building Construction
    Lee, Kyuhyup
    Kwon, Soonwook
    Shin, Joonghwan
    Chung, Suwan
    Lee, Songyi
    [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 121 - 127
  • [8] The first high-rise concrete modular integrated construction building in Hong Kong
    Lee, Paul
    Lee, Jacqueline
    Yuen, Ming
    Tang, Siu-Chung
    Chu, Joelle
    Au, Sonic
    Tai, Yeny
    Wong, Colin
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2023, 177 (01) : 25 - 31
  • [9] BIM-based estimation of vertical transportation demands during the construction of high-rise buildings
    Wu, Keyi
    de Soto, Borja Garcia
    Adey, Bryan T.
    Zhang, Feilian
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 110
  • [10] Construction Technology of High-rise Building Structure
    Cheng, Peng
    Chen, Xinfu
    Wu, Lang
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2316 - +