Study on Bi-level Programming Model for Traffic Control on Massive Activities

被引:0
|
作者
Zhang, Liangzhi [1 ,2 ]
Bai, Lutao [3 ]
He, Minai [1 ]
Jia, Lei [2 ]
机构
[1] Shandong Jiaotong Univ, Dept Traff & Logist Engn, Jinan, Shandong, Peoples R China
[2] Shandong Univ, Sch Automat Sci & Engn, Jinan, Shandong, Peoples R China
[3] China Northeast Municipal Engn Design & Res Inst, Changchun, Peoples R China
关键词
bi-level programming; massive activities; rough set; traffic control; evacuation;
D O I
10.1109/WCICA.2010.5553986
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the massive activities of cities, rush hour is short while traffic flow is great. Traffic flow is unbalanced on time and space. If the measure of traffic control is not right, the traffic is affected badly. In this paper, a bi-level programming model about traffic control measure is brought forward. In upper level, providing key member with high transportation service is first thought over, and then the sum of travel delay of the masses and cost of traffic control is minimized. In lower level, evacuation delay of activities personnel is designed to ensure no traffic jam emerged. Rough set genetic algorithm is employed to solving bi-level programming problem in the paper, and an example of traffic control to massive activity verifies the validity of the technique.
引用
收藏
页码:4003 / 4007
页数:5
相关论文
共 3 条