A comparison between artificial neural network method and nonlinear regression method to estimate the missing hydrometric data

被引:6
|
作者
Bahrami, J. [1 ,2 ]
Kavianpour, M. R. [1 ]
Abdi, M. S. [2 ]
Telvari, A. [3 ]
Abbaspour, K. [4 ]
Rouzkhash, B. [5 ]
机构
[1] KN Toosi Univ Technol, Dept Civil & Struct Engn, Tehran, Iran
[2] Univ Kurdistan, Dept Civil Engn, Sanandaj, Iran
[3] Islamic Azad Univ, Dept Civil Engn, Ahvaz, Iran
[4] Swiss Fed Inst Aquat Sci & Technol, CH-8600 Dubendorf, Switzerland
[5] Iran Water Resources Management Co, Tehran, Iran
关键词
artificial neural network; missing hydrometric data; nonlinear regression; ANN; PREDICTION; SIMULATION;
D O I
10.2166/hydro.2010.069
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Missing values are a common problem faced in the analysis of hydrometric data. The need for complete hydrological data, especially hydrometric data for planning, development and designing hydraulic structures, has become increasingly important. Reasonably estimating these missing values is significant for the complete analysis and modeling of the hydrological cycle. The major objective of this paper is to estimate the missing annual maximum hydrometric data by using artificial neural networks (ANN). Sixteen stations, with 28 years of measurements, in the catchment area of the Sefidroud watershed in the north of Iran were selected for this investigation. Comparison between the results of ANN and the nonlinear regression method (NLR) illustrated the efficiency of artificial neural networks and their ability to rebuild the missing data. According to the coefficient of determination (R-2) and the root mean squared value of error (RMSE), it was concluded that ANN provides a better estimation of the missing data.
引用
收藏
页码:245 / 254
页数:10
相关论文
共 50 条
  • [1] Home telehealth and quality of life: Comparison between the artificial neural network and regression method
    Huang, Jui-Chen
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2011, 14 (03): : 675 - 683
  • [2] A Method to Estimate Regression Model Confidence Interval and Risk of Artificial Neural Network Model
    Nicodemus, Rajasekhar
    Ambarkar, Vinay Maruthi
    Ray, Sudipto
    Schipperijn, Frank W.
    SAE INTERNATIONAL JOURNAL OF ENGINES, 2023, 16 (03) : 291 - 304
  • [3] Comparison between BP Neural Network and Multiple Linear Regression Method
    Wang, Guoli
    Wu, Jianhui
    Yin, Sufeng
    Yu, Liqun
    Wang, Jing
    INFORMATION COMPUTING AND APPLICATIONS, 2010, 6377 : 365 - 370
  • [4] APPLICATION OF AN ARTIFICIAL NEURAL NETWORK AND MULTIPLE NONLINEAR REGRESSION TO ESTIMATE CONTAINER SHIP LENGTH BETWEEN PERPENDICULARS
    Cepowski, Tomasz
    Chorab, Pawel
    Lozowicka, Dorota
    POLISH MARITIME RESEARCH, 2021, 28 (02) : 36 - 45
  • [5] New method to estimate the generalization error of artificial neural network
    Li, J.
    Han, Z.Z.
    Kongzhi Lilun Yu Yinyong/Control Theory and Applications, 2001, 18 (02):
  • [6] A method to estimate missing AERONET AOD values based on artificial neural networks
    Olcese, Luis E.
    Palancar, Gustavo G.
    Toselli, Beatriz M.
    ATMOSPHERIC ENVIRONMENT, 2015, 113 : 140 - 150
  • [7] A method based on artificial neural network to estimate the health of wind turbine
    Li, Hui
    Yang, Jiarong
    Zhang, Menghang
    Guo, Shuangquan
    Lv, Wei
    Liu, Zongchang
    2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 919 - 922
  • [8] Field Telemetry Drilling Dataset Modeling with Multivariable Regression, Group Method Data Handling, Artificial Neural Network, and the Proposed Group-Method-Data-Handling-Featured Artificial Neural Network
    Mohammad, Amir
    Belayneh, Mesfin
    APPLIED SCIENCES-BASEL, 2024, 14 (06):
  • [9] Using artificial neural networks to estimate missing rainfall data
    Kuligowski, RJ
    Barros, AP
    JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 1998, 34 (06): : 1437 - 1447
  • [10] Method and application of data processing on artificial neural network
    Li, Chunhao
    Li, Lihui
    Yang, Yinsheng
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 1997, 17 (07): : 106 - 109