共 50 条
- [1] Development of ATACS and first-phase control run tests (advanced train administration and communications system) 1999 IEEE 49TH VEHICULAR TECHNOLOGY CONFERENCE, VOLS 1-3: MOVING INTO A NEW MILLENIUM, 1999, : 2283 - 2287
- [3] The new train control system ATACS by using ADS technologies IWADS: 2ND INTERNATIONAL WORKSHOP ON AUTONOMOUS DECENTRALIZED SYSTEM, PROCEEDINGS, 2002, : 206 - 210
- [4] MATISSE: Alignment, Integration and Test Phase First Results OPTICAL AND INFRARED INTERFEROMETRY AND IMAGING V, 2016, 9907
- [6] TRAFFIC CONGESTION CONTROL-SYSTEM IN THE COMMERCIAL TEST PHASE AND ITS IMPROVEMENT JAPAN TELECOMMUNICATIONS REVIEW, 1981, 23 (02): : 120 - 124
- [7] INTELSIS - Photovoltaic Test Bench. First Experimental Results 2017 22ND IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION (ETFA), 2017,
- [8] GEOSTAR - Scientific goals of the project and results of the first test phase OCEANS'98 - CONFERENCE PROCEEDINGS, VOLS 1-3, 1998, : 1088 - 1090
- [10] Detecting asymmetries in balance control with system identification: first experimental results from Parkinson patients Journal of Neural Transmission, 2007, 114 : 1333 - 1337