A Full-Scale Case Study on the Leaching Process of Acid Rock Drainage in Waste Rock Piles and the Net Infiltration Through Cover Systems

被引:6
|
作者
Ma, Liang [1 ]
Huang, Cheng [1 ]
Liu, Zhong-Sheng [1 ]
Morin, Kevin A. [2 ]
Dy, Eben [1 ]
Tufa, Kidus [1 ]
Fisher, Elizabeth [1 ]
Zhou, Jianqin [1 ]
Aziz, Mike [3 ]
Meints, Cody [3 ]
机构
[1] Natl Res Council Canada, Energy Min & Environm Res Ctr, 4250 Wesbrook Mall, Vancouver, BC V6T 1W5, Canada
[2] Minesite Drainage Assessment Grp, Surrey, BC, Canada
[3] Newmont Goldcorp Inc, Equ Silver Mine, Reclamat Operat, POB 1450, Houston, BC V0J 1Z0, Canada
来源
WATER AIR AND SOIL POLLUTION | 2020年 / 231卷 / 06期
关键词
Full-scale waste rock piles; Acid rock drainage; Leaching process; Leaching chemistry; Net infiltration rate; HYDRAULIC CONDUCTIVITY; MINE DRAINAGE; MODEL;
D O I
10.1007/s11270-020-04660-5
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The leaching process and drainage chemistry of acid rock drainage is mainly controlled by geochemical reactions and how water carries soluble reaction products in waste rock piles. This paper studied how water flows through a full-scale waste rock pile at the Equity Silver mine site in British Columbia, Canada and elaborated on their effects on the leaching process and drainage chemistry. A revised dual-permeability model coupled with mass transport was adopted to investigate preferential flow and matrix flow in the pile simultaneously while considering water and geochemical products leaching/exchange between them. Furthermore, a particle-level water film model and also the effects of air flow, oxygen transport, and heat transfer in pile scale were integrated to account for geochemical reactions. Simulation results of full-scale iron discharge showed that aqueous concentrations in drainage water did not vary significantly relative to variations in drainage flow rate, which was confirmed by 12 years of field monitoring data. In addition, the comparison of pre- and post-cover simulations with measured lime consumption during ARD treatment, and mass-balance/dilution calculations for the entire pile, indicates that roughly 15-20% of total precipitation passes through the cover.
引用
收藏
页数:16
相关论文
共 18 条
  • [1] A Full-Scale Case Study on the Leaching Process of Acid Rock Drainage in Waste Rock Piles and the Net Infiltration Through Cover Systems
    Liang Ma
    Cheng Huang
    Zhong-Sheng Liu
    Kevin A. Morin
    Eben Dy
    Kidus Tufa
    Elizabeth Fisher
    Jianqin Zhou
    Mike Aziz
    Cody Meints
    [J]. Water, Air, & Soil Pollution, 2020, 231
  • [2] Prediction of acid rock drainage in waste rock piles Part 1: Water film model for geochemical reactions and application to a full-scale case study
    Ma, Liang
    Huang, Cheng
    Liu, Zhong-Sheng
    Morin, Kevin A.
    Aziz, Mike
    Meints, Cody
    [J]. JOURNAL OF CONTAMINANT HYDROLOGY, 2019, 220 : 98 - 107
  • [3] Prediction of acid rock drainage in waste rock piles part 2: Water flow patterns and leaching process
    Ma, Liang
    Huang, Cheng
    Liu, Zhong-Sheng
    Morin, Kevin A.
    Aziz, Mike
    Meints, Cody
    [J]. JOURNAL OF CONTAMINANT HYDROLOGY, 2021, 242
  • [4] Reduction of acid rock drainage using steel slag in cover systems over sulfide rock waste piles
    de Almeida, Rodrigo Pereira
    Leite, Adilson do Lago
    Soares, Anderson Borghetti
    [J]. WASTE MANAGEMENT & RESEARCH, 2015, 33 (04) : 353 - 362
  • [5] The correlation between drainage chemistry and weather for full-scale waste rock piles based on artificial neural network
    Ma, Liang
    Huang, Cheng
    Liu, Zhong-Sheng
    Morin, Kevin A.
    Aziz, Mike
    Meints, Cody
    [J]. JOURNAL OF CONTAMINANT HYDROLOGY, 2021, 239
  • [6] Supplementing structural integrity of waste rock piles through improved packing protocols to aid acid rock drainage prevention strategies
    Mjonono, D.
    Harrison, S. T. L.
    Kotsiopoulos, A.
    [J]. MINERALS ENGINEERING, 2019, 135 : 13 - 20
  • [7] Relocation and submergence of net-acid-generating waste rock for control of acidic drainage: A case study
    Morin, KA
    Hutt, NM
    [J]. ICARD 2000, VOLS I AND II, PROCEEDINGS, 2000, : 819 - 825
  • [8] Leaching behaviour of copper slag, construction and demolition waste and crushed rock used in a full-scale road construction
    Lidelow, Sofia
    Macsik, Josef
    Carabante, Ivan
    Kumpiene, Jurate
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2017, 204 : 695 - 703
  • [9] ORGANIC WASTE VALORIZATION THROUGH COMPOSTING PROCESS: A FULL-SCALE CASE STUDY IN MAXIXE, MOZAMBIQUE
    Perteghella, Andrea
    Vaccari, Mentore
    [J]. ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2017, 16 (08): : 1819 - 1826
  • [10] Controls of uncertainty in acid rock drainage predictions from waste rock piles examined through Monte-Carlo multicomponent reactive transport
    Daniele Pedretti
    K. Ulrich Mayer
    Roger D. Beckie
    [J]. Stochastic Environmental Research and Risk Assessment, 2020, 34 : 219 - 233