Temporal Evolution of Clear-Water Local Scour at Aligned and Skewed Complex Bridge Piers

被引:33
|
作者
Yang, Yifan [1 ]
Melville, Bruce W. [1 ]
Macky, Graham H. [1 ]
Shamseldin, Asaad Y. [1 ]
机构
[1] Univ Auckland, Dept Civil & Environm Engn, Private Bag 92019, Auckland 1142, New Zealand
关键词
TIME; SCALE; GEOMETRY; DEPTH;
D O I
10.1061/(ASCE)HY.1943-7900.0001732
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Scour at bridge piers is time-dependent. In this paper, temporal evolution of clear-water scour at complex bridge piers is studied experimentally. The pier model has a typical form comprising three components, namely a rectangular column, a rectangular pile-cap, and a group of vertical piles underneath. Various relative pile-cap positions and skew angles (alpha) from 0 degrees to 45 degrees were used to investigate their influence on scour evolution. New functions are proposed to fit temporal data and determine the equilibrium scour depth with better accuracy. The results show that the locations for scour initiation and the maximum scour depth may be different, and their relationship varies with pile-cap position and pier skew angle. Highly skewed piers tend to overcome the influence of width ratio of column to pile-cap (Dc/Dpc) on scour evolution, as the column itself becomes dominant. The sensitivity of scour evolution to pier skew angle decreases with higher pile-cap position, especially when it is entirely above the original bed. Four scour development stages were identified for complex piers, including initiation, stagnation, a developing stage, and equilibrium, with each stage being highly dependent on the degree of exposure of each of the pier components. The description of each development stage for different situations is given. The equilibrium time scale t* and the equilibrium scour depth dse for complex piers have similar dependence on flow shallowness ratio (y0/De) and sediment coarseness ratio (De/d50), as per the equation proposed by an authors' previous study (Yang et al. 2018). A new equation is proposed to correct the percentage rate of scour development. The correction is especially useful for aligned complex piers, for which the rate of scour time development may be much lower than that for single-column piers. In general, we recommend using the modified Sheppard-Melville method and the corrected time-scale equation in this paper to predict clear-water equilibrium scour depth and scour evolution at complex bridge piers.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Clear-Water Local Scour at Skewed Complex Bridge Piers
    Yang, Yifan
    Melville, Bruce W.
    Sheppard, D. M.
    Shamseldin, Asaad Y.
    [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2018, 144 (06)
  • [2] Clear-water scour at long skewed bridge piers
    Ahmad, Nordila
    Melville, Bruce
    Mohammad, Thamer
    Ali, Faisal
    Yusuf, Badronnisa
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2017, 40 (01) : 10 - 18
  • [3] Clear-water scour evolution at dual bridge piers
    Yilmaz, Meric
    Yanmaz, A. Melih
    Koken, Mete
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2017, 44 (04) : 298 - 307
  • [4] Temporal Evolution of Clear-Water Local Scour at Bridge Piers with Flow-Dependent Debris Accumulations
    Cantero-Chinchilla, Francisco Nicolas
    de Almeida, Gustavo Adolfo Mazza
    Manes, Costantino
    [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2021, 147 (10)
  • [5] Clear-water scour at bridge piers and abutments
    Kothyari, U. C.
    Hager, W. H.
    Oliveto, G.
    [J]. RIVER FLOW 2006, VOLS 1 AND 2, 2006, : 1743 - +
  • [6] Method for Estimating Clear-Water Local Scour Rate at Complex Piers
    Sheppard, D. Max
    Yang, Yifan
    Melville, Bruce
    [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2023, 149 (10)
  • [7] CLEAR-WATER SCOUR AT CYLINDRICAL PIERS
    RAUDKIVI, AJ
    ETTEMA, R
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1983, 109 (03): : 338 - 350
  • [8] Experimental Investigation of Clear-Water Local Scour of Compound Piers
    Ataie-Ashtiani, B.
    Baratian-Ghorghi, Z.
    Beheshti, A. A.
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2010, 136 (06): : 343 - 351
  • [9] Clear-water scour at bridge piers in fine and medium gravel beds
    Raikar, RV
    Dey, S
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2005, 32 (04) : 775 - 781
  • [10] A framework for probabilistic assessment of clear-water scour around bridge piers
    Tubaldi, Enrico
    Macorini, Lorenzo
    Izzuddin, Bassam A.
    Manes, Costantino
    Laio, Francesco
    [J]. STRUCTURAL SAFETY, 2017, 69 : 11 - 22