共 50 条
- [31] Methods for reducing the simulation design cycle in the 300mm era of semiconductor manufacturing INDUSTRIAL ENGINEERING SOLUTIONS '99 CONFERENCE, PROCEEDINGS, 1999, : 224 - 229
- [32] Integrating dynamic fab capacity and automation models for 300mm semiconductor manufacturing PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 1505 - 1509
- [33] SIMULATION OF A FULL 300MM SEMICONDUCTOR MANUFACTURING PLANT WITH MATERIAL HANDLING CONSTRAINTS PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 1568 - +
- [34] Simultaneous Optimization of Dispatching and Routing for OHT Systems via Hybrid System Modeling 39TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY (IECON 2013), 2013, : 4416 - 4421
- [35] Multiobjective Lot Scheduling and Dynamic OHT Routing in a 300-mm Wafer Fab 2008 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), VOLS 1-6, 2008, : 1607 - 1612
- [36] Overview for 300 mm foundry manufacturing PROCEEDINGS OF THE IEEE 2001 INTERNATIONAL INTERCONNECT TECHNOLOGY CONFERENCE, 2001, : I - III
- [38] Litho area cycle time reduction in an advanced 300mm semiconductor manufacturing line 2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 114 - +
- [39] Vehicle clustering phenomenon in automatic materials handling systems in 300mm semiconductor manufacturing Mater Sci Forum, PART 2 (1129-1134):