An optimal OHT dispatching system for 300 mm semiconductor manufacturing

被引:0
|
作者
Liu, CY [1 ]
Liao, DY [1 ]
机构
[1] Ming Chuan Univ, Sch Commun, Taipei, Taiwan
关键词
OHT dispatching; 300 mm semiconductor manufacturing; integer programming;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents the development of an optimization-based system for OHT (Overhead Hoist Transport) dispatching with blocking effects in 300mm semiconductor manufacturing. The OHT dispatching Problem is first formulated into an integer programming problem with OHT dynamics and location constraints. We adopt the linear programming solver, LINDO, to develop the optimal OHT dispatching system. Numerical results demonstrate that this approach performs well in minimizing the total completion time of transport jobs while minimizing the traveling times of empty but dispatched vehicles. It takes about 6.5 seconds to solve the problems of realistic scale. The developed Optimal OHT dispatching system is effective and applicable in practice.
引用
收藏
页码:1631 / 1636
页数:6
相关论文
共 50 条
  • [31] Methods for reducing the simulation design cycle in the 300mm era of semiconductor manufacturing
    Sokhan-Sanj, S
    Wu, S
    Paprotny, I
    Mackulak, GT
    INDUSTRIAL ENGINEERING SOLUTIONS '99 CONFERENCE, PROCEEDINGS, 1999, : 224 - 229
  • [32] Integrating dynamic fab capacity and automation models for 300mm semiconductor manufacturing
    DeJong, CD
    Fischbein, SA
    PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2000, : 1505 - 1509
  • [33] SIMULATION OF A FULL 300MM SEMICONDUCTOR MANUFACTURING PLANT WITH MATERIAL HANDLING CONSTRAINTS
    Kiba, Jean-Etienne
    Lamiable, Gilles
    Dauzere-Peres, Stephane
    Yugma, Claude
    PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 1568 - +
  • [34] Simultaneous Optimization of Dispatching and Routing for OHT Systems via Hybrid System Modeling
    Nakamura, Ryosuke
    Sawada, Kenji
    Shin, Seiichi
    Kumagai, Kenji
    Yoneda, Hisato
    39TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY (IECON 2013), 2013, : 4416 - 4421
  • [35] Multiobjective Lot Scheduling and Dynamic OHT Routing in a 300-mm Wafer Fab
    Yang, Jia-Wei
    Cheng, Hsueh-Chien
    Chiang, Tsung-Che
    Fu, Li-Chen
    2008 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), VOLS 1-6, 2008, : 1607 - 1612
  • [36] Overview for 300 mm foundry manufacturing
    Tsai, NS
    PROCEEDINGS OF THE IEEE 2001 INTERNATIONAL INTERCONNECT TECHNOLOGY CONFERENCE, 2001, : I - III
  • [37] Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system
    Lee, Y. F.
    Jiang, Z. B.
    Liu, H. R.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (03) : 866 - 884
  • [38] Litho area cycle time reduction in an advanced 300mm semiconductor manufacturing line
    van der Eerden, Joris
    Saenger, Tim
    Walbrick, Walter
    Niesing, Henk
    Schuurhuis, Ron
    2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 114 - +
  • [39] Vehicle clustering phenomenon in automatic materials handling systems in 300mm semiconductor manufacturing
    Department of Information Management, National Chi-Nan University, Puli, Nantou, 545, Taiwan
    Mater Sci Forum, PART 2 (1129-1134):
  • [40] Vehicle Look-Ahead Dispatching for Overhead Hoist Transport System in Semiconductor Manufacturing
    Benzoni, Anna
    Yugma, Claude
    Bect, Pierre
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2023, 36 (01) : 130 - 138