The open shop scheduling problem with a given sequence of jobs on one machine

被引:1
|
作者
Shafransky, YM
Strusevich, VA [1 ]
机构
[1] Byelarussian Acad Sci, Inst Engn Cybernet, Minsk, BELARUS
[2] Univ Greenwich, London SE18 6PF, England
关键词
open shop; complexity; approximation;
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper considers the open shop scheduling problem to minimize the makespan, provided that one of the machines has to process the jobs according to a given sequence. We show that in the preemptive case the problem is polynomially solvable for an arbitrary number of machines. If preemption is not allowed, the problem is NP-hard in the strong sense if the number of machines is variable, and is NP-hard in the ordinary sense in the case of two machines. For the latter case we give a heuristic algorithm that runs in linear time and produces a schedule with the makespan that is at most 5/4 times the optimal value. We also show that the two-machine problem in the nonpreemptive case is solvable in pseudopolynomial time by a dynamic programming algorithm, and that the algorithm can be converted into a fully polynomial approximation scheme. (C) 1998 John Wiley & Sons, Inc.
引用
收藏
页码:705 / 731
页数:27
相关论文
共 50 条