Coordination Scheduling of Wind-Hydropower Generation and Profit Allocation Based on Shapley Value Method

被引:3
|
作者
Quan, Yi [1 ,2 ]
Jiang, Min [3 ]
Sun, Hongjun [4 ]
Yuan, Xiaohui [2 ]
He, Li [1 ]
Fu, Bo [1 ]
机构
[1] Hubei Univ Technol, Hubei Key Lab High Efficiency Utilizat Solar Ener, Wuhan 430068, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
[3] China Univ Geosci, Sch Foreign Languages, Wuhan 430074, Peoples R China
[4] Shanghai Marine Equipment Res Inst, Shanghai 200031, Peoples R China
基金
中国国家自然科学基金;
关键词
ENERGY-STORAGE; SYSTEM;
D O I
10.1155/2020/4785183
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The volatility of wind makes the forecasting of wind speed unreliable. The inaccurate forecast in wind speed always leads to generation imbalance and causes Wind Generating Companies' (WGenCOs) losses in the intrahour market. In contrast to wind power, Hydrogenerating Companies (HGenCOs) can utilize the reservoir volume to settle the fluctuation of water inflow easily. When treated as a specialized Spinning Reserve (SR) unit for wind power, hydropower can help to settle the generation imbalance and obtain more profit in the power market for both power plants. In this paper, the author establishes a coordination scheduling model of wind-hydro alliance which covers the day-ahead market and the intrahour market. First, to evaluate the deviation of the wind-hydro generation in the intrahour market, an imbalance charge rule considering each period of schedule horizon is constructed. Second, the author introduces two parameters to control the resources that hydropower can use to coordinate with wind power. Finally, the author introduces the Shapley value method to allocate the profit of the alliance which comprises several independent entities fairly. For the simulation of uncertainties, the scenario-based approach is used to simulate the water inflow of a reservoir considering the Monte Carlo (MC) method. The wind speed for the intrahour market is forecasted with the Autoregressive Integrated Moving Average (ARIMA) model. Simulations are implemented, and the results show that when treated as an SR unit for wind power, hydropower can diminish the imbalance charges significantly and will improve the revenue of the wind-hydro alliance. Furthermore, the coordination operation also helps reduce the spillage of the reservoir and the curtailment of the wind power to achieve better utilization of renewable energy.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Research on Profit Allocation of Campus Express Alliance Based on the Improved Shapley Value Method
    Zhuang, Yu-feng
    Ma, Li-li
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 715 - 722
  • [2] Modified Shapley Value-Based Profit Allocation Method for Wind Power Accommodation and Deep Peak Regulation of Thermal Power
    Wu, Wanli
    Zhu, Jizhong
    Chen, Yixi
    Luo, Tengyan
    Shi, Puxin
    Guo, Wanshu
    Shi, Peiran
    Jiang, Changming
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2023, 59 (01) : 276 - 288
  • [3] Profit Allocation to Virtual Power Plant Members Based on Improved Multifactor Shapley Value Method
    Ma X.
    Yu S.
    Zhu S.
    Wang G.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2020, 35 : 585 - 595
  • [4] An Improved Profit Allocation Method of Load Aggregator based on Shapley Value under Government Regulation
    Si, Ruihua
    Liu, Wanxun
    Shao, Hongbo
    Zhou, Shichao
    Wang, Zhiqi
    PROCEEDINGS OF 2019 IEEE 3RD INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC), 2019, : 710 - 715
  • [5] The Study of Profit Allocation among the Contractors of the Construction Supply Chain Based on the Shapley Value Method
    Zhang Hengquan
    Feng Xuena
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1536 - 1540
  • [6] Profit allocation in production cooperative game based on interval shapley value
    School of Management and Economics, Beijing Institute of Technology, Beijing 100081, China
    Beijing Ligong Daxue Xuebao, 2008, 7 (655-658): : 655 - 658
  • [7] Synergistic benefit allocation method for wind-solar-hydro complementary generation with sampling-based Shapley value estimation method
    Zhang L.
    Xie J.
    Zhang Q.
    Fu D.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (09): : 126 - 132
  • [8] Profit Allocation in Manufacturing and Logistics Industry Alliance Based on Interval Shapley Value
    Wang, Xiaoyan
    Jiang, Liqi
    LISS 2013, 2015, : 67 - 74
  • [9] Optimal Hourly Scheduling for Wind-Hydropower Systems with Integrated Pumped-Storage Technology
    Xu, Jiuping
    Liu, Tingting
    JOURNAL OF ENERGY ENGINEERING, 2021, 147 (03)
  • [10] A Shapley Value Perspective on Profit Allocation for RFID Technology Alliance
    Xu, Wei
    Yang, Zhixin
    Wang, Hengyu
    2014 11TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2014,