Statistical Distribution Analysis and Prediction of Time Between Failures in On-board Train Control Equipment

被引:0
|
作者
Cai, Baigen [1 ]
Shi, Xiyao [1 ]
Wei Shangguan [1 ]
Li, Zhengjiao [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Elect & Informat Engn, Beijing, Peoples R China
基金
中国国家自然科学基金; 北京市自然科学基金;
关键词
reliability; weibull distribution; grey relational analysis; on-board train control equipment; time between failures; support vector machine;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
On-board train control equipment is the core equipment to ensure the safety and smooth operation of the train, the prognostics and health management for on-board equipment(OBE) has great significance. In this paper, aiming at the uncertainty of OBE failure and under the circumstances of less failure samples, puts forward that regard the whole OBE as a black box, the analysis and prediction of time between failures is conducted. Firstly, through the statistical analysis of the train operation fault log files, the sample series of time between failures(TBF) is obtained. The statistical distribution analysis is performed for the sample series, and the Weibull distribution model is established and tested, it shows that it has certain rules and can be predicted. Finally, TBF is used for short time prediction based on grey support vector machine, the accuracy of general and serious faults are 86.87% and 90.04% respectively by example verification, it shows that this method has good predictive effect, the prediction results have certain guiding significance for CBM.
引用
收藏
页码:767 / 772
页数:6
相关论文
共 50 条
  • [1] A study on the real-time reliability of on-board equipment of train control system
    Zhang, Yong
    Li, Shiwei
    [J]. 2017 2ND INTERNATIONAL CONFERENCE ON RELIABILITY ENGINEERING (ICRE 2017), 2018, 351
  • [2] An interbus for on-board train control equipment on the CAN bus
    Yang, T
    Xu, ZS
    [J]. COMPUTERS IN RAILWAYS VII, 2000, 7 : 1099 - 1106
  • [3] Reliability Analysis Method for On-board Equipment of Train Control System Based on Resilience Effect
    Shangguan, Wei
    Hu, Fuwei
    Yuan, Min
    Cai, Baigen
    Wang, Jian
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2018, 40 (06): : 75 - 82
  • [4] Fault Analysis Method of On-board Equipment of Train Control System Based on Rough Set Theory
    Shangguan, Wei
    Zhang, Junzheng
    Feng, Juan
    Cai, Baigen
    Wang, Jian
    Li, Zhengjiao
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2018, 40 (04): : 60 - 67
  • [5] Text Mining in Fault Analysis for On-board Equipment of High-speed Train Control System
    Bin, Chen
    Cai Baigen
    Wei, Shangguan
    [J]. 2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 6907 - 6911
  • [6] Fault Prediction of On-Board Train Control Equipment Using a CGAN-Enhanced XGBoost Method with Unbalanced Samples
    Liu, Jiang
    Xu, Kangzhi
    Cai, Baigen
    Guo, Zhongbin
    [J]. MACHINES, 2023, 11 (01)
  • [7] Automatic train control with on-board computers
    Matsumoto, M
    Mizukami, Y
    Kawata, T
    Ichihara, Y
    Nagatsugu, Y
    [J]. COMPUTERS IN RAILWAYS VIII, 2002, 13 : 93 - 102
  • [8] Analysis on Space-time Characteristics and Reliability Evaluation of Train Control On-board Subsystem
    Chen, Bin
    Cai, Baigen
    Shangguan, Wei
    Wang, Jian
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (12): : 56 - 65
  • [9] Resilience Quantitative Evaluation Framework and Performance Improvement for Train Control System On-board Equipment
    Wei ShangGuan
    Hu, Fuwei
    Yuan, Min
    Cai, Baigen
    Wang, Jian
    Zang, Yu
    [J]. 2016 IEEE 19TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2016, : 2675 - 2680
  • [10] The Study of Tilting Train Installation for ATP(Automatic Train Protection) On-board Equipment
    Hyen, Baek Jong
    Kyu, Kim Yong
    [J]. INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS (ICCAS 2010), 2010, : 723 - 727