共 18 条
- [2] Under frequency relay setting for tie line and load shedding of an industrial power system with multiple cogeneration units IEEE Conf Rec Annu Pulp Pap Ind Tech Conf, (184-189):
- [3] Under frequency relay setting for tie line and load shedding of an industrial power system with multiple cogeneration units CONFERENCE RECORD OF 1999 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 1999, : 184 - 189
- [4] Power quality solutions for low and medium voltage critical loads 2004 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, 2004, : 326 - 331
- [5] Under-voltage relay settings for the tie-lines tripping in an upgrading cogeneration plant TENCON 2004 - 2004 IEEE REGION 10 CONFERENCE, VOLS A-D, PROCEEDINGS: ANALOG AND DIGITAL TECHNIQUES IN ELECTRICAL ENGINEERING, 2004, : C264 - C267
- [6] OPTIMIZATION OF EXTRACTION POSITION UNDER LOW LOADS OPERATION OF POWER PLANT IN POWER-WATER COGENERATION PROCEEDINGS OF THE ASME 2020 POWER CONFERENCE (POWER2020), 2020,
- [7] Analysis on Wind Power Plant Voltage Quality and Design of STATCOM Control PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ENERGY, POWER AND ELECTRICAL ENGINEERING, 2016, 56 : 70 - 74
- [8] Design of automated power supply and plant services for critical and sensitive industrial installations National Conference Publication - Institution of Engineers, Australia, 1989, (89 pt 15):
- [9] Analysis and design of a new voltage sag compensator for critical loads in electrical power distribution systems CONFERENCE RECORD OF THE 2002 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-4, 2002, : 911 - 916