Review and classification of constructive heuristics mechanisms for no-wait flow shop problem

被引:18
|
作者
Nagano, Marcelo Seido [1 ]
Miyata, Hugo Hissashi [1 ]
机构
[1] Univ Sao Paulo, Dept Prod Engn, Sch Engn Sao Carlos, Ave Trabalhador Saocarlense 400, BR-13566590 Sao Paulo, Brazil
关键词
No-wait flow shop; Review and classification; Simple heuristics; Composite heuristics; TOTAL COMPLETION-TIME; DEPENDENT SETUP TIMES; SCHEDULING PROBLEM; M-MACHINE; MAKESPAN CRITERION; IN-PROCESS; AVAILABILITY CONSTRAINTS; MINIMIZING MAKESPAN; SEQUENCING PROBLEM; MAXIMUM LATENESS;
D O I
10.1007/s00170-015-8209-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Permutation flow shop scheduling has been studied since the 1950s. Due to practical applications and because of its complex nature, several constrains have been studied, for example the no-wait flow shop problem. Classified as non-deterministic polynomial-time hard (NP-hard), several constructive heuristics have been proposed to reach the best trade-off between quality of the solution and computational time. This paper aims to present a review and classification of constructive heuristics proposed for no-wait flow shop problem with additional constraints (setup times, machine unavailability, release dates, and due dates) and several criterion objectives (makespan, total flow time, due date consideration, and multi-criterion objectives). As a result of the literature review, constructive heuristics were classified according to its composition (initial sequence generation, constructive phase, and improvement phase) and category (simple or composite). Several different mechanisms from the considered phases could be identified. These mechanisms can be combined to develop new constructive heuristics and can be applied for other scheduling problems. Besides, final considerations highlight directions for future possible researches, mainly the development of new strategies, for each phase considered.
引用
收藏
页码:2161 / 2174
页数:14
相关论文
共 50 条
  • [1] Review and classification of constructive heuristics mechanisms for no-wait flow shop problem
    Marcelo Seido Nagano
    Hugo Hissashi Miyata
    The International Journal of Advanced Manufacturing Technology, 2016, 86 : 2161 - 2174
  • [2] Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem
    Shao, Weishi
    Shao, Zhongshi
    Pi, Dechang
    COMPUTERS & OPERATIONS RESEARCH, 2021, 136
  • [3] Heuristics for the no-wait flow shop problem with makespan criterion
    Department of Computer Science and Technology, University of Science and Technology of China, Hefei 230027, China
    不详
    Jisuanji Xuebao, 2008, 7 (1147-1154):
  • [4] Some meta-heuristics for no-wait flow shop problem
    Sch. of Computer Sci., Liaocheng Univ., Liaocheng 252059, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2007, 5 (967-970): : 967 - 970
  • [5] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization
    Kaizhou Gao
    Quanke Pan
    P. N. Suganthan
    Junqing Li
    The International Journal of Advanced Manufacturing Technology, 2013, 66 : 1563 - 1572
  • [6] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization
    Gao, Kaizhou
    Pan, Quanke
    Suganthan, P. N.
    Li, Junqing
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12): : 1563 - 1572
  • [7] A High Quality Solution Constructive Heuristic for No-Wait Flow Shop Scheduling Problem
    Nagano, Marcelo Seido
    Miyata, Hugo Hissashi
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2016, 15 (03): : 206 - 214
  • [8] Comparison of Initial Solutions of Heuristics for No-wait Flow Shop Scheduling
    Sapkal, Sagar
    Laha, Dipak
    COMPUTATIONAL INTELLIGENCE AND INFORMATION TECHNOLOGY, 2011, 250 : 294 - 298
  • [9] A constructive heuristic for minimizing makespan in no-wait flow shop scheduling
    Dipak Laha
    Uday K. Chakraborty
    The International Journal of Advanced Manufacturing Technology, 2009, 41 : 97 - 109
  • [10] A constructive heuristic for minimizing makespan in no-wait flow shop scheduling
    Laha, Dipak
    Chakraborty, Uday K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (1-2): : 97 - 109