Key performance parameter thresholds for the Giant Magellan Telescope

被引:0
|
作者
Sitarski, Breann N. [1 ]
Angeli, George Z. [2 ]
Gajadhar, Sarah [3 ]
Conan, Rodolphe [1 ]
Bouchez, Antonin H. [1 ]
Goodrich, Robert [1 ]
Walls, Brian [1 ]
机构
[1] GMTO Corp, 465 N Halstead St,Suite 250, Pasadena, CA 91107 USA
[2] GAAS Corp, 6925 N Camino De Las Candelas, Tucson, AZ 85718 USA
[3] SG Consulting Inc, 2258 Wascana Greens, Regina, SK, Canada
关键词
systems engineering; key performance parameters; compliance monitoring; ground-based observatories; threshold estimation;
D O I
10.1117/12.2630324
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Giant Magellan Telescope project established Key Performance Parameters (KPPs) for measuring, tracking, and managing the evolution of expected observatory performance through construction and commissioning. The KPPs are inherently statistical variables. The performance of the as-built observatory depends on environmental and operational parameters. Just as importantly, its performance also depends on not fully predictable programmatic processes and technical uncertainties associated with design and construction. Mitigation of technical risks and management response to realized technical risks have critical impact on achieved performance through decisions allocating project resources to remedy potentially impaired performance. While the requirements capture the objective values of KPPs, relaxed threshold values represent the minimum acceptable performance that must be achieved in support of the scientific objectives of the observatory. Properly defined threshold values may reduce project risk exposure and aid project management in building and delivering the observatory on time and on budget. This paper reports our statistical approach to determine the KPP threshold values the project can accomplish with high confidence level in the face of programmatic and technical uncertainties. The method identifies the technical risks threatening KPPs and carefully characterizes them to ensure their suitability for further evaluation. This paper also demonstrates a Monte Carlo approach to using recognized project and subsystem risks to bound the probability density functions for performance, cost, and schedule impacts, which are in turn applied to each KPP error budget to determine threshold values. The analysis is integrated into the project's statistical risk and contingency estimation framework.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Key Performance Parameter based systems engineering for the Giant Magellan Telescope through construction and commissioning
    Angeli, George Z.
    Sitarski, Breann
    Conan, Rodolphe
    Walls, Brian
    Bouchez, Antonin
    Goodrich, Robert
    Millan-Gabet, Rafael
    Gajadhar, Sarah
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY IX, 2020, 11450
  • [2] The Giant Magellan Telescope phasing strategy and performance
    Quiros-Pacheco, F.
    Schwartz, David
    Das, Kaushik
    Conan, Rodolphe
    Bouchez, Antonin H.
    Irarrazaval, Ben
    McLeod, Brian A.
    GROUND-BASED AND AIRBORNE TELESCOPES VII, 2018, 10700
  • [3] Performance of the Giant Magellan Telescope phasing system
    Quiros-Pacheco, Fernando
    Conan, Rodolphe
    Bouchez, Antonin
    McLeod, Brian
    GROUND-BASED AND AIRBORNE TELESCOPES VI, 2016, 9906
  • [4] Giant Magellan telescope (GMT)
    Johns, M
    SECOND BACKASKOG WORKSHOP ON EXTREMELY LARGE TELESCOPES, PTS 1 AND 2, 2003, 5382 : 85 - 94
  • [5] Design of the Giant Magellan Telescope
    Johns, Matt
    Hull, Charles
    Muller, Gary
    Irarrazaval, Ben
    Bouchez, Antonin
    Chylek, Tomas
    Smith, Carey
    Wadhavkar, Abhijit
    Bigelow, Bruce
    Gunnels, Steven
    McLeod, Brian
    Buleri, Christine
    GROUND-BASED AND AIRBORNE TELESCOPES V, 2014, 9145
  • [6] Giant Magellan Telescope - Overview
    Johns, Matt
    McCarthy, Patrick
    Raybould, Keith
    Bouchez, Antonin
    Farahani, Arash
    Filgueira, Jose
    Jacoby, George
    Shectman, Steve
    Sheehan, Michael
    GROUND-BASED AND AIRBORNE TELESCOPES IV, 2012, 8444
  • [7] Instrumentation for the giant Magellan telescope
    Shectman, S
    SECOND BACKASKOG WORKSHOP ON EXTREMELY LARGE TELESCOPES, PTS 1 AND 2, 2003, 5382 : 699 - 705
  • [8] Design and expected performance of an MCAO system for the Giant Magellan Telescope
    Milton, NM
    Lloyd-Hart, M
    Cheng, A
    Georges, JA
    Angel, JR
    ASTRONOMICAL ADAPTIVE OPTICS SYSTEMS AND APPLICATIONS, 2003, 5169 : 238 - 249
  • [9] Science Instruments for the Giant Magellan Telescope
    Millan-Gabet, R.
    Rahmer, G.
    Bernstein, R. A.
    Souza, A.
    Schoenell, W.
    Demers, R.
    Szentgyorgyi, A.
    Fabricant, D.
    Ribeiro, R.
    Sharp, R.
    Jaffe, D. T.
    Lee, S.
    Lawrence, J.
    Crane, J.
    Males, J.
    Nemati, B.
    GROUND-BASED AND AIRBORNE INSTRUMENTATION FOR ASTRONOMY X, 2024, 13096
  • [10] Systems Engineering for the Giant Magellan Telescope
    Angeli, George Z.
    Bernstein, Rebecca
    Walls, Brian
    Bouchez, Antonin
    Conan, Rodolphe
    Irarrazaval, Benjamin
    Sitarski, Breann
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VIII, 2018, 10705