On Minimizing Feedback Overhead for Two-stage Switches

被引:0
|
作者
Hu, Bing [1 ]
Yeung, Kwan L. [1 ]
Liu, N. H. [1 ]
机构
[1] Univ Hong Kong, Dept Elect & Elect Engn, Hong Kong, Hong Kong, Peoples R China
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
A novel feedback-based two-stage switch architecture is presented in [1] for solving the packet mis-sequencing problem in designing two-stage switches. With this architecture, each middle-stage port j piggybacks an N-bit VOQ occupancy vector to an output port k in each time slot. As output k and input k reside on the same line-card, input k schedules a packet for sending in the next time slot based on the N-bit feedback. In this paper, we focus on designing efficient packet scheduling algorithms for cutting down the number of feedback bits required while minimizing the negative impact to switch performance. The basic idea is to partition N VOQs at a middle-stage port into M non-overlapped sets. In each time slot, only the queue occupancies of selected sets are sent. By exploiting the otherwise wasted bandwidth in the first-stage switch, each input port is also allowed to piggyback its VOQ status to middle-stage ports. This allows each middle-stage port to intelligently select the sets of VOQs for feedback. Extensive simulation results show that among our proposed scheduling algorithms, the Set-feedback scheduler provides the best performance under various traffic conditions.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] A novel feedback mechanism for load balanced two-stage switches
    Yeung, Kwan L.
    Hu, Bing
    Liu, N. H.
    2007 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS, VOLS 1-14, 2007, : 6193 - 6198
  • [2] Feedback-Based Scheduling for Load-Balanced Two-Stage Switches
    Hu, Bing
    Yeung, Kwan L.
    IEEE-ACM TRANSACTIONS ON NETWORKING, 2010, 18 (04) : 1077 - 1090
  • [3] Maintaining packet order in two-stage switches
    Keslassy, I
    McKeown, N
    IEEE INFOCOM 2002: THE CONFERENCE ON COMPUTER COMMUNICATIONS, VOLS 1-3, PROCEEDINGS, 2002, : 1032 - 1041
  • [4] Two-stage time minimizing assignment problem
    Sonia
    Puri, M. C.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (05): : 730 - 740
  • [5] Fuse Selection for the Two-Stage Explosive Type Switches
    Muravlev, I. O.
    Surkov, M. A.
    Tarasov, E. V.
    Uvarov, N. F.
    5TH INTERNATIONAL CONFERENCE: MODERN TECHNOLOGIES FOR NON-DESTRUCTIVE TESTING, 2017, 189
  • [6] Minimizing tardy jobs in a two-stage hybrid flowshop
    Gupta, JND
    Tunc, EA
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (09) : 2397 - 2417
  • [7] Preservation of conditionally nonblocking switches under two-stage interconnection
    Li, Shuo-Yen Robert
    Tan, Xuesong Jonathan
    IEEE TRANSACTIONS ON COMMUNICATIONS, 2007, 55 (05) : 973 - 980
  • [8] A novel algorithm for maintaining packet order in two-stage switches
    Zhang, XN
    Xu, D
    Li, LM
    ETRI JOURNAL, 2005, 27 (04) : 469 - 472
  • [9] Minimizing makespan in a two-stage system with flowshop and open shop
    Su, LH
    Chou, FD
    Ting, WC
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 49 (04) : 520 - 536
  • [10] Minimizing the number of tardy jobs on a two-stage assembly flowshop
    Allahverdi, Ali
    Aydilek, Asiye
    Aydilek, Harun
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 391 - 403