共 7 条
- [1] Guideline for project cost control for large-scale projects using probabilistic methods BAUINGENIEUR, 2018, 93 : 355 - 364
- [2] PROJECT COST ESTIMATE AT COMPLETION: EARNED VALUE MANAGEMENT VERSUS EARNED SCHEDULE-BASED REGRESSION MODELS. A COMPARATIVE ANALYSIS OF THE MODELS APPLICATION IN THE CONSTRUCTION PROJECTS IN ROMANIA ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2018, 52 (03): : 205 - 216
- [5] KNOWLEDGE-BASED ANALYSIS OF LARGE-SCALE SYSTEMS BY USING A MATHEMATICAL-HEURISTIC MODEL - METHODOLOGY OF SIMULATION AND CONTROL, AND RESULTS SYSTEMS ANALYSIS MODELLING SIMULATION, 1990, 7 (09): : 675 - 692
- [6] Using simulation-based assistance systems for risks-integrated planning and control of large-scale projects e.g. in the fields of plant engineering or construction industry SIMULATION IN PRODUKTION UND LOGISTK 2013, 2013, 316 : 491 - 503