Dismantling of nuclear power plants at optimal NPV

被引:5
|
作者
Bartels, Jan-Hendrik [1 ]
Gather, Thorsten [1 ]
Zimmermann, Juergen [1 ]
机构
[1] Tech Univ Clausthal, Inst Management & Econ, D-38678 Clausthal Zellerfeld, Germany
关键词
Resource-constrained project scheduling; Multiple execution modes; Dismantling of nuclear power plants; Net-present-value optimization;
D O I
10.1007/s10479-010-0788-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Today, worldwide far more than 100 nuclear power plants, which have been decommissioned in the recent years, are waiting for their complete dismantling. Since the dismantling of a single reactor causes costs of up to one billion Euros and lasts up to 15 years, the elaboration of a scheduling approach helping to optimize the net present value of a dismantling project seems to be worthwhile. In this paper we present a resource-constrained project scheduling approach optimizing the total discounted disbursements of dismantling a nuclear power plant. For the corresponding NP-hard optimization problem, we introduce an appropriate project scheduling model with minimum and maximum time lags, renewable and cumulative resources as well as multiple execution modes. To solve this model, we introduce a relaxation-based enumeration approach that delivers optimal solutions for problem instances containing up to 50 activities.
引用
收藏
页码:407 / 427
页数:21
相关论文
共 50 条
  • [1] Dismantling of nuclear power plants at optimal NPV
    Jan-Hendrik Bartels
    Thorsten Gather
    Jürgen Zimmermann
    [J]. Annals of Operations Research, 2011, 186 : 407 - 427
  • [2] Dismantling of nuclear power plants
    不详
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2005, 50 (07):
  • [3] Safe dismantling of nuclear power plants
    Lutz, Thorsten
    Bringmann, Nicola
    [J]. JOT, Journal fuer Oberflaechentechnik, 2021, 61 (10): : 82 - 85
  • [4] Selection methodology of the optimal cutting technology for dismantling of components in nuclear power plants
    Lee, Ga-Ram
    Lim, Byung-Ju
    Cho, Dae-Won
    Park, Chang-Dae
    [J]. ANNALS OF NUCLEAR ENERGY, 2022, 166
  • [5] Cost Effective Decommissioning and Dismantling of Nuclear Power Plants
    Wasinger, Karl
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2012, 57 (10): : 593 - +
  • [6] An evaluation of the dismantling technologies for decommissioning of nuclear power plants
    Jeong, KwanSeong
    Choi, ByungSeon
    Moon, Jeikwon
    Hyun, Dongjun
    Lee, JongHwan
    Kim, IkJune
    Kim, GeunHo
    Seo, JaeSeok
    [J]. ANNALS OF NUCLEAR ENERGY, 2014, 69 : 62 - 64
  • [7] Conventional Waste Management - Significance for the Dismantling of Nuclear Power Plants
    Dietrich, Maria
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2022, 67 (01): : 38 - 42
  • [8] Occupational Health and Safety during the Dismantling of Nuclear Power Plants
    Bojer, Reinhard
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2023, 68 (01): : 25 - 28
  • [9] The KWS Training Power Plant Zwentendorf - Optimal Conditions for Practical Training in the Sectors of Maintenance and Dismantling of Nuclear Power Plants
    Maassen, Herbert
    [J]. ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2014, 59 (06): : 371 - +
  • [10] Decommissioning and dismantling nuclear plants
    Eickelpasch, N
    [J]. ATW-INTERNATIONALE ZEITSCHRIFT FUR KERNENERGIE, 1996, 41 (04): : 267 - 267