Transmission Expansion Planning for the Optimization of Renewable Energy Integration in the Sulawesi Electricity System

被引:4
|
作者
Tumiran [1 ]
Putranto, Lesnanto Multa [1 ]
Irnawan, Roni [1 ]
Sarjiya [1 ]
Priyanto, Adi [2 ]
Isnandar, Suroso [2 ]
Savitri, Ira [2 ]
机构
[1] Univ Gadjah Mada, Dept Elect & Informat Engn, Graf St 2, Yogyakarta 55281, Indonesia
[2] PT PLN Persero, Trunojoyo St,Blok M-I 135, South Jakarta 12160, Dki Jakarta, Indonesia
关键词
transmission expansion planning; backbone voltage level; economic voltage; N-1; contingency; voltage stability; WIND;
D O I
10.3390/su131810477
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In order to meet the growth in demand and the renewable energy integration target, the Sulawesi Electricity System (SES) should be expanded. Currently, the SES is divided into two systems, namely South and North Sulawesi. These two systems have different characteristics, such as the system size, reliability and operational cost. North Sulawesi is smaller, weaker and more expensive than the South System. In order to improve the system reliability, generation and transmission expansion planning should be executed simultaneously to meet the economical investment cost and satisfy the reliability standard. For this purpose, the necessity of a backbone system with a higher voltage level than the existing 150 kV system should be considered, including the interconnection option between the two existing systems in Sulawesi. A methodology based on economic and technical criteria was developed to determine the backbone voltage level. Two voltage level options were considered, namely 275 and 500 kV. Several criteria were considered in order to determine the backbone voltage level, including the economic voltage, the line-loading limit, N-1 contingency, short circuiting, transient stability, voltage stability and small signal stability. The backbone voltage candidates should fulfil all of the criteria. The simulation was conducted in base- and high-demand scenarios, considering the fluctuation of future economic growth. The load flow and the dynamic analysis were simulated in a DIgSILENT Power Factory environment. The results showed that the 275 kV backbone, which was built in 2022, would violate three criteria: the economic voltage, N-1 contingency and voltage stability. On the other hand, the 500 kV backbone voltage level fulfills all of the criteria. The result of this research was considered in the electricity planning documents in Sulawesi. From a technical and economical perspective, the 500 kV backbone was chosen for the SES.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Transmission Expansion Planning Considering Wholesale Electricity Market and Integration of Renewable Generation
    Obushevs, Artjoms
    Oleinikova, Irina
    [J]. 2014 11TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2014,
  • [2] Transmission Expansion Planning Optimization for Improving RES Integration on Electricity Market
    Sima, Catalina Alexandra
    Lazaroiu, George Cristian
    Dumbrava, Virgil
    [J]. 2017 10TH INTERNATIONAL SYMPOSIUM ON ADVANCED TOPICS IN ELECTRICAL ENGINEERING (ATEE), 2017, : 855 - 859
  • [3] Long-Term Generation Expansion Planning in Sulawesi Electricity System Considering High Share of Intermittent Renewable Energy Resource
    Muthahhari, Ahmad Ahmad
    Putranto, Lesnanto Multa
    Sarjiya
    Anugerah, Faqih Shokhib
    Priyanto, Adi
    Isnandar, Suroso
    Savitri, Ira
    [J]. 2019 11TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND ELECTRICAL ENGINEERING (ICITEE 2019), 2019,
  • [4] Transmission System Planning Considering Integration of Renewable Energy Resources
    Tang, Lei
    Wen, Fushuan
    Salam, Md. Abdus
    Ang, Swee Peng
    [J]. 2015 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2015,
  • [5] Power System Planning Assessment for Optimizing Renewable Energy Integration in the Maluku Electricity System
    Tumiran, Tumiran
    Putranto, Lesnanto Multa
    Irnawan, Roni
    Sarjiya, Sarjiya
    Nugraha, Candra Febri
    Priyanto, Adi
    Savitri, Ira
    [J]. SUSTAINABILITY, 2022, 14 (14)
  • [6] Transmission network expansion planning: towards enhanced renewable integration
    Michi, Luigi
    Migliori, Michela
    Bugliari, Angelo Caldarulo
    Aluisio, Benedetto
    Giannuzzi, Giorgio Maria
    Carlini, Enrico Maria
    [J]. 2018 AEIT INTERNATIONAL ANNUAL CONFERENCE, 2018,
  • [7] Model based approach for planning dynamic integration of renewable energy in a transitioning electricity system
    Sharma, Tarun
    Balachandra, P.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 105 : 642 - 659
  • [8] Probabilistic Generation and Transmission Planning With Renewable Energy Integration
    Liang, Xiaodong
    Mazin, Hooman Erfanian
    Reza, Syed Enam
    [J]. 2017 IEEE/IAS 53RD INDUSTRIAL AND COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE (I&CPS), 2017,
  • [9] An approach for transmission system expansion planning in electricity market
    Falvo, M. C.
    [J]. 2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2860 - 2866
  • [10] Joint Transmission Expansion Planning and Energy Storage Placement in Smart Grid Towards Efficient Integration of Renewable Energy
    Hedayati, Mojgan
    Zhang, Junshan
    Hedman, Kory W.
    [J]. 2014 IEEE PES T&D CONFERENCE AND EXPOSITION, 2014,