Assessment of transaction costs for construction projects

被引:10
|
作者
Abdel-Galil, Emad [1 ]
Ibrahim, Ahmed H. [2 ]
Alborkan, Ahmed [3 ]
机构
[1] Port Said Univ, Fac Engn, Port Said, Egypt
[2] Zagazig Univ, Fac Engn, Zagazig, Egypt
[3] Higher Inst Engn & Technol, Civil Engn, New Damietta, Egypt
关键词
Transaction costs; pre-transaction costs; post-transaction costs; construction management; construction project; ECONOMICS; ORGANIZATION;
D O I
10.1080/15623599.2020.1738204
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The main premise of transaction cost economics is that project cost is not only production costs but there are also additional costs resulting from transactions between parties. Transaction costs include the costs of preparing the bidding package, estimating and drawing up a contract, administering the contract, dealing with any deviations from contract conditions and any contractual problems include claims, change orders, and disputes. The main objectives of this paper are to establish the factors that affecting transaction costs in construction projects in Egypt, assessing its value in Egyptian construction projects, and to provide a mathematical model that can predict transaction costs value accurately. The study was conducted on various types of construction projects in Egypt, which formed the sample size. To collect data, a questionnaire was used that was personally administered to the respondents, using emails and conducting semi-structured interviews. The collected data were analyzed by using SPSS program, and a software package named IBM. The findings indicated that: the most important factors affecting positively (decreasing transaction cost value) on transaction cost value in construction projects in Egypt are: the financial position of the contractor, claims filed by the contractor, material substitutions by the contractor, contractor experience in similar type projects, contractor`s relationship with previous clients, contractor qualification to do the job, and procurement method. Transaction cost in the pre-contract phase of construction projects in Egypt is approximately (3-4) % of the contract value on average, and the average value for post-contract transaction cost is approximately (8-9) % of the contract value. All factors accredited as influential factors were taken into account and developed in an account model, the study devolved accounting models that can predict transaction cost value as a percentage of the project capital for construction projects in Egypt, two techniques were used, first is regression analysis with two methods (enter-stepwise), and second is the neural network, all models showed a high accuracy up to 95% in predicting transaction cost value for construction projects in Egypt.
引用
收藏
页码:1618 / 1631
页数:14
相关论文
共 50 条
  • [1] Determinants of transaction costs in construction projects
    Li, Huimin
    Arditi, David
    Wang, Zhuofu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (05) : 548 - 558
  • [2] Transaction costs in construction projects under uncertainty
    Guo, Lei
    Li, Huimin
    Li, Peng
    Zhang, Chengyi
    KYBERNETES, 2016, 45 (06) : 866 - 883
  • [3] Factors That Affect Transaction Costs in Construction Projects
    Li, Huimin
    Arditi, David
    Wang, Zhuofu
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) : 60 - 68
  • [4] Factors Influencing Transaction Costs in Construction Projects: A Critical Review
    Jin, Xiao-Hua
    Zhang, Guomin
    Ke, Yongjian
    Xia, Bo
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 949 - 958
  • [5] A COMPARATIVE STUDY BETWEEN CHINA AND USA ON THE INFLUENCING PATH OF TRANSACTION COSTS IN CONSTRUCTION PROJECTS
    Li, Huimin
    Zhang, Chengyi
    PROCEEDINGS OF INTERNATIONAL STRUCTURAL ENGINEERING AND CONSTRUCTION: INTERACTION BETWEEN THEORY AND PRACTICE IN CIVIL ENGINEERING AND CONSTRUCTION, 2016, : 337 - 342
  • [6] Configurations for high outsourcing performance in construction projects: an integrated perspective of transaction costs and capabilities
    Zhang, Ruyan
    Fu, Yongcheng
    Chen, Yongqiang
    Du, Bo
    Ma, Danfeng
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2025, 18 (01) : 209 - 240
  • [7] Factors affecting transaction costs and collaboration in projects
    Haaskjold, Haavard
    Andersen, Bjorn
    Laedre, Ola
    Aarseth, Wenche
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2019, 13 (01) : 197 - 230
  • [8] Transaction costs incurred by construction owners
    Li, Huimin
    Arditi, David
    Wang, Zhuofu
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (04) : 444 - +
  • [9] Transparency of Costs in Construction Projects
    不详
    BAUINGENIEUR, 2014, 89 : A30 - A30
  • [10] Transaction costs of carbon offset projects: A comparative study
    Cacho, Oscar J.
    Lipper, Leslie
    Moss, Jonathan
    ECOLOGICAL ECONOMICS, 2013, 88 : 232 - 243