共 48 条
- [3] Prediction of shovel productivity in the Gol-e-Gohar iron mine Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2005, (02): : 97 - 104
- [4] Feasibility study and economic evaluation for Deposit No 3 of Gol-e-Gohar iron ore deposit IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 381 - +
- [6] Prediction of Shovel Productivity in the Gol-e-Gohar Iron Mine Journal of Mining Science, 2005, 41 : 177 - 184
- [7] Optimising the loading system of Gol-e-Gohar iron ore mine of Iran by genetic algorithm IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 211 - +
- [8] Modelling of dry magnetic separator by artificial neural network at Gol-e-Gohar iron ore mine IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 295 - +
- [9] DETERMINATION OF OPTIMUM CONDITIONS TO REMOVE SULFUR AND PHOSPHOR FROM GOL-E-GOHAR IRON ORE CONCENTRATE IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B-ENGINEERING, 2009, 33 (B3): : 267 - 278
- [10] INFLUENCE OF FLOTATION PARAMETERS ON DECREASING SULFUR AND PHOSPHORUS CONTENT IN THE GOL-e-GOHAR IRON ORE CONCENTRATE PHYSICOCHEMICAL PROBLEMS OF MINERAL PROCESSING, 2011, 46 : 173 - 190