Converting AG to SAG mills: The Gol-E-Gohar Iron Ore Company case

被引:13
|
作者
Maleki-Moghaddam, M. [1 ]
Yahyaei, M. [1 ]
Banisi, S. [1 ]
机构
[1] Shahid Bahonar Univ Kerman, Min Engn Grp, Fac Engn, Kerman, Iran
关键词
SAG mill; Mill filling; Lifter face angle; Ball trajectory; LINER WEAR; TUMBLING MILLS; LIFTER DESIGN; PROFILE; DEM; BEHAVIOR; MOTION; SPEED;
D O I
10.1016/j.powtec.2011.10.014
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9 m x 2.05 m AG (autogenous) mills (fixed speed) are used in parallel in a dry operation. The performance of AG mills has been lower than the target value indicated by an increase in the product size (P-80; 80% passing size) from 450 mu m (target) to 515 pm and low power draw (50% of nominal). By simulation it was found that increasing the liner lifter face angle from 7 to 30 degrees while keeping the original lifter height (i.e., 22.5 cm) could provide an appropriate charge trajectory. When the proposed liners installed in one of the AG mills, the throughput increased by 27%; when 5% (v/v balls were added the throughput increased by 40%. The product size also decreased from 515 to 501 mu m. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:100 / 106
页数:7
相关论文
共 48 条
  • [1] The effect of residual flocculants in the circulating water on dewatering of Gol-e-Gohar iron ore
    Bahmani-Ghaedi, Abdolreza
    Hassanzadeh, Ahmad
    Sam, Abbas
    Entezari-Zarandi, Ali
    MINERALS ENGINEERING, 2022, 179
  • [2] Prediction of shovel productivity in the Gol-e-Gohar iron mine
    Osanloo, M
    Hekmat, A
    JOURNAL OF MINING SCIENCE, 2005, 41 (02) : 177 - 184
  • [3] Prediction of shovel productivity in the Gol-e-Gohar iron mine
    Osanloo, M.
    Hekmat, A.
    Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2005, (02): : 97 - 104
  • [4] Feasibility study and economic evaluation for Deposit No 3 of Gol-e-Gohar iron ore deposit
    Namin, F. Samimi
    Shahriar, K.
    Abadi, H. Dehghan Jan
    IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 381 - +
  • [5] Effect of particle size distribution on the dewatering circuit design; case study: iron ore tailing of the Gol-E-Gohar mining and industrial company
    Saeid, Zare
    Gholamabbas, Parsapour
    Mojtaba, Ghorbannejad
    Alireza, Hasankhoei
    CANADIAN METALLURGICAL QUARTERLY, 2024,
  • [6] Prediction of Shovel Productivity in the Gol-e-Gohar Iron Mine
    M. Osanloo
    A. Hekmat
    Journal of Mining Science, 2005, 41 : 177 - 184
  • [7] Optimising the loading system of Gol-e-Gohar iron ore mine of Iran by genetic algorithm
    Aghajani, A.
    Osanloo, M.
    Akbarpour, M.
    IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 211 - +
  • [8] Modelling of dry magnetic separator by artificial neural network at Gol-e-Gohar iron ore mine
    Khanbabaei, H. R.
    Sam, A.
    Kohsari, A.
    Yeganeh, B.
    IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 295 - +
  • [9] DETERMINATION OF OPTIMUM CONDITIONS TO REMOVE SULFUR AND PHOSPHOR FROM GOL-E-GOHAR IRON ORE CONCENTRATE
    Soltanmohammadi, V.
    Noaparast, M.
    Kohsari, A. Hossein
    Zamani, F.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B-ENGINEERING, 2009, 33 (B3): : 267 - 278
  • [10] INFLUENCE OF FLOTATION PARAMETERS ON DECREASING SULFUR AND PHOSPHORUS CONTENT IN THE GOL-e-GOHAR IRON ORE CONCENTRATE
    Soltanmohammadi, Vahid
    Noaparast, Mohammad
    Kohsari, Amir Hossein
    Zamani, Farshid
    PHYSICOCHEMICAL PROBLEMS OF MINERAL PROCESSING, 2011, 46 : 173 - 190