Scoring of Tenders in Construction Projects Using Group Method of Data Handling

被引:6
|
作者
Mehrabani, Masoud Nouri [1 ]
Golafshani, Emadaldin Mohammadi [1 ]
Ravanshadnia, Mehdi [1 ]
机构
[1] Islamic Azad Univ, Sci & Res Branch, Dept Civil Engn, Tehran, Iran
关键词
Scoring of tenders; Group method of data handling; Construction projects; Bidding; Decision-making; BID/NO-BID DECISION; NEURAL-NETWORKS; SELECTION; MODEL; CONTRACTORS; FRAMEWORK; SYSTEM; TOOL;
D O I
10.1007/s12205-020-1537-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In a competitive construction environment, contractors are often faced with a large number of tenders that compel them to make the best decision in a limited time. In this paper, a decision support system (DSS) based on group method of data handling model (GMDH) was developed for the scoring of tenders (STs). Based on a comprehensive study of the existing literature and experts' opinions, seven criteria were extracted, namely client, contract, company, consulting engineers, project status/situation, risk, and economic criteria as the inputs of the system. To develop the DSS, the data from 135 tenders were collected from the previous tenders of a private construction contractor. The results illustrate that the proposed model, with a negligible error, is reliable in ST. Moreover, the proposed model specifies the score of new tenders, and decision-makers (DMs) can easily make their decisions in prioritizing and evaluating new tenders. Furthermore, a sensitivity analysis was performed to address the importance of the criteria, and it was concluded that the contract related criterion is the most important principle to the contractor. Eventually, a graphical user interface was designed in a user-friendly environment which allows the decision-makers to visualize the S T.
引用
收藏
页码:1996 / 2008
页数:13
相关论文
共 50 条
  • [1] Scoring of Tenders in Construction Projects Using Group Method of Data Handling
    Masoud Nouri Mehrabani
    Emadaldin Mohammadi Golafshani
    Mehdi Ravanshadnia
    [J]. KSCE Journal of Civil Engineering, 2020, 24 : 1996 - 2008
  • [2] A method to encourage and assess innovations in public tenders for infrastructure and construction projects
    Lenderink, Bart
    Halman, Johannes I. M.
    Boes, Hans
    Voordijk, Hans
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (02): : 171 - 189
  • [3] Porosity prediction using the group method of data handling
    AlBinHassan, Nasher M.
    Wang, Yanghua
    [J]. GEOPHYSICS, 2011, 76 (05) : O15 - O22
  • [4] An Intelligent System for Cost Data Handling in Construction Projects
    Martinez-Rojas, Maria
    Marin, Nicolas
    Molina, Carlos
    Amparo Vila, Ma
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2016, : 359 - 366
  • [5] Using the group method of data handling to estimate image quality
    Baloev, VA
    [J]. JOURNAL OF OPTICAL TECHNOLOGY, 2002, 69 (12) : 883 - 885
  • [6] AQUATIC ECOSYSTEM IDENTIFICATION USING THE GROUP METHOD OF DATA HANDLING
    SERRANO, A
    GENTIL, S
    [J]. ENVIRONMENTAL TECHNOLOGY LETTERS, 1985, 6 (12): : 517 - 525
  • [7] Software Reliability Prediction Using Group Method of Data Handling
    Mohanty, Ramakanta
    Ravi, V.
    Patra, Manas Ranjan
    [J]. ROUGH SETS, FUZZY SETS, DATA MINING AND GRANULAR COMPUTING, PROCEEDINGS, 2009, 5908 : 344 - +
  • [8] USING GROUP METHOD OF DATA HANDLING FOR BRAIN COMPUTER INTERFACE
    Varaganti, Ravikanth
    Schetinin, Vitaly
    [J]. UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 900 - 906
  • [9] Using group method of data handling to model customer choice behaviour
    Zhu, B.
    He, C. H.
    Niu, Y.
    [J]. SCIENTIA IRANICA, 2014, 21 (03) : 1051 - 1060
  • [10] Monitoring an experimental reactor using the group method of data handling approach
    Gonçalves, IM
    Ting, DKS
    Ferreira, PB
    Upadhyaya, BR
    [J]. NUCLEAR TECHNOLOGY, 2005, 149 (01) : 101 - 109