共 50 条
- [1] Multi-trip Pickup and Delivery Problem, with Split Loads, Profits and Multiple Time Windows to Model a Real Case Problem in the Construction Industry PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS (ICORES), 2021, : 200 - 207
- [3] Multi-trip pickup and delivery problem with time windows and synchronization Annals of Operations Research, 2017, 253 : 899 - 934
- [6] A RVND plus ILS Metaheuristic to Solve the Delivery Man Problem with Time Windows COMPUTATIONAL DATA AND SOCIAL NETWORKS, 2019, 11917 : 63 - 69