A two-stage method using biogeography-based optimization for simultaneous network reconfiguration and renewable energy integration

被引:1
|
作者
Al Samman, Mohammad [1 ]
Mokhlis, Hazlie [1 ]
Rahman, Mir Toufikur [2 ]
Mansor, Nurulafiqah Nadzirah [1 ]
Alotaibi, Majed A. [3 ]
机构
[1] Univ Malaya, Fac Engn, Dept Elect Engn, Kuala Lumpur 50603, Malaysia
[2] RMIT Univ, Sch Engn, Melbourne, Vic 3000, Australia
[3] King Saud Univ, Coll Engn, Dept Elect Engn, Riyadh 11421, Saudi Arabia
关键词
POWER LOSS MINIMIZATION; DISTRIBUTED GENERATION; DISTRIBUTION-SYSTEMS; GENETIC ALGORITHM; LOSS REDUCTION; CUCKOO SEARCH; ENHANCEMENT; ALLOCATION; PLACEMENT; LOSSES;
D O I
10.1063/1.5144366
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Renewable Energy Resources (RERs) are a promising source of energy with hardly any pollution. Due to the intermittent nature from the output power of the nondispatchable RER and the load variations in the distribution network, it is important to frequently perform Network Reconfiguration (NR) to minimize the power loss and improve the network's voltage profile. Finding the optimal NR while simultaneously considering the dispatchable RER integration is important but challenging because of the complex combinational nature of the problem, and therefore, it is commonly solved by meta-heuristic techniques. However, the conventional meta-heuristic techniques involve random initializations and normally generate many nonfeasible solutions, which obstruct the search process. With the aim of improving the accuracy and consistency of the solution, this study proposes a two-stage method using biogeography-based optimization to attain the NR simultaneously with the RER placement and sizing for the sake of minimizing power loss and voltage deviation. The first stage simplifies the distribution network and then utilizes the simplified form to provide a better set of initial solutions and to maintain the network radiality. Thereafter, the second stage finds the final NR and RER locations and sizes. The simulations are carried out on 33-bus, 69-bus, and 118-bus systems, and the results are compared with previously published methods and some well-known optimization methods. In addition, load variations and RER's uncertainty are also considered. The obtained results show that the proposed method outperforms the existing methods. The results also indicate the significance of the hourly NR in reducing power loss.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Two-stage update biogeography-based optimization using differential evolution algorithm (DBBO)
    Boussaid, Ilhem
    Chatterjee, Amitava
    Siarry, Patrick
    Ahmed-Nacer, Mohamed
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (08) : 1188 - 1198
  • [2] A two-stage differential biogeography-based optimization algorithm and its performance analysis
    Zhao, Fuqing
    Qin, Shuo
    Zhang, Yi
    Ma, Weimin
    Zhang, Chuck
    Song, Houbin
    EXPERT SYSTEMS WITH APPLICATIONS, 2019, 115 : 329 - 345
  • [3] Adaptive Constrained Multi-objective Biogeography-based Optimization Based on Two-stage Elite Selection
    Wang, Jue
    Li, Bo
    Cao, Yinghong
    2017 NINTH INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN-MACHINE SYSTEMS AND CYBERNETICS (IHMSC 2017), VOL 2, 2017, : 365 - 369
  • [4] Renewable Energy-Based Economic Load Dispatch Using Two-Step Biogeography-Based Optimization and Butterfly Optimization Algorithm
    Kundu, Subham
    Roy, Provas Kumar
    Mandal, Barun
    INTERNATIONAL JOURNAL OF SWARM INTELLIGENCE RESEARCH, 2020, 11 (04) : 24 - 60
  • [5] Combining Differential Evolution Algorithm with Biogeography-Based Optimization Algorithm for Reconfiguration of Distribution Network
    Li, Jingwen
    Zhao, Jinquan
    2012 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2012,
  • [6] A two-stage evaluation and optimization method for renewable energy development based on data envelopment analysis
    Zeng, Yuan
    Guo, Waiying
    Wang, Hongmei
    Zhang, Fengbin
    APPLIED ENERGY, 2020, 262
  • [7] Two-stage Core Backbone Network Optimization Strategy for Power Systems With Renewable Energy
    Zhao Y.
    Han C.
    Lin Z.
    Yang L.
    Wang L.
    Huang J.
    Dianwang Jishu/Power System Technology, 2019, 43 (02): : 371 - 380
  • [8] Two-Stage Optimization Method for Network Reconfiguration and Load Recovery During Power System Restoration
    Liao, Shiwu
    Yao, Wei
    Han, Xingning
    Wen, Jinyu
    Hou, Yunhe
    2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [9] Urgent task-aware cloud manufacturing service composition using two-stage biogeography-based optimisation
    Wang, Yan
    Dai, Ziwei
    Zhang, Wenyu
    Zhang, Shuai
    Xu, Yangbing
    Chen, Qian
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2018, 31 (10) : 1034 - 1047
  • [10] Optimization of Two-Stage Pygas Hydrogenation Reactor Based on Hydrogen Network Integration
    Huang, Lingjun
    Liu, Guilian
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (31) : 10539 - 10550