Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions

被引:18
|
作者
van Ooijen, HPG [1 ]
Bertrand, JWM [1 ]
机构
[1] Eindhoven Univ Technol, Fac Technol Management, Dept Operat Planning & Control, NL-5600 MB Eindhoven, Netherlands
关键词
lead times; cost optimal; delivery performance; due date;
D O I
10.1016/S0925-5273(01)00131-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The trade-off between the length of the lead times quoted to the customers and the delivery reliability has been investigated by many authors. However, only a few studies do this in an economic setting. In this study, the setting of cost optimal due dates taking into account lead-time related and tardiness related costs is investigated. More specifically, in setting the internal due dates, which are used for determining the priorities on the shop floor, and in determining the expected order flow time probability density functions which are used for setting the external due dates, the work load is taken into account. From this study, it follows that this approach leads to (much) lower costs as compared to the situation with workload independent order flow time p.d.f.'s. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:261 / 268
页数:8
相关论文
共 6 条