Influence of Selected Substrate Dosage on the Process of Biogas Installation Start-Up in Real Conditions

被引:3
|
作者
Ignatowicz, Katarzyna [1 ]
Piekarski, Jacek [2 ]
Kogut, Pawel [3 ]
机构
[1] Bialystok Tech Univ, Fac Civil Engn & Environm Sci, PL-15351 Bialystok, Poland
[2] Koszalin Univ Technol, Fac Civil Engn Environm & Geodet Sci, PL-75453 Koszalin, Poland
[3] Reg Waste Recovery Facil Sianow, PL-76004 Sianow, Poland
关键词
biogas plant; substrate; agricultural biogas plants; energy production; HYDRAULIC RETENTION TIME; ANAEROBIC CO-DIGESTION; ORGANIC LOADING RATE; FOOD WASTE; MANURE; PLANT; PERFORMANCE; CSTR; TEMPERATURE; INDICATORS;
D O I
10.3390/en14185948
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents an analysis of selected parameters of biogas, formed as a result of methane fermentation, during the start-up of a biogas installation, using water, liquid manure, corn silage and inoculated sludge as substrates. Moreover, the dependencies between the type and amount of the supplied substrate and the obtained parameters of biogas and fermentation mass are presented and explained. During 59 days after the start of the biogas plant operation, the methane content increased to a maximum of about 62%. Finally, after about 80 days, the methane content stabilized at a constant level of about 55%. CO2 content increased from about 6% (day 32) to about 46% (day 84), with a clear linear correlation between carbon dioxide and methane content. Oxygen content decreased from about 18% (day 32) to about 0.3% (day 84) as the resulting gases displaced air from the reactor, and there was also a linear correlation between oxygen and methane content. The hydrogen sulfide content decreased from about 76 ppm (day 32) to about 0 ppm (day 47), after which, in a clear power correlation to the methane content, it maximally increased to 890 ppm (day 61). However, for the sake of safe engine operation, the desulfurization plant was started on day 63, which resulted in a H2S concentration below 50 ppm on day 74 of the experiment. The final hydrogen sulfide content was 9 ppm on day 84 of the biogas plant start-up.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] SYSTEM INSTALLATION, START-UP, AND CHECKOUT
    LANDS, S
    [J]. I&CS-CONTROL TECHNOLOGY FOR ENGINEERS AND ENGINEERING MANAGEMENT, 1987, 60 (12): : 40 - 42
  • [2] Influence of start-up modes on the noise characteristics of mixed-flow pump during start-up process
    Zhu, Guojun
    Xuan, Yifan
    Feng, Jianjun
    Tang, Zhenbo
    Li, Yunzhe
    Wang, Like
    [J]. MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2024, 214
  • [3] Laboratory Simulation of an Agricultural Biogas Plant Start-up
    Kozlowski, Kamil
    Dach, Jacek
    Lewicki, Andrzej
    Cieslik, Marta
    Czekala, Wojciech
    Janczak, Damian
    Brzoski, Michal
    [J]. CHEMICAL ENGINEERING & TECHNOLOGY, 2018, 41 (04) : 711 - 716
  • [4] Installation and start-up of multiphase pumps on the Dunbar platform
    不详
    [J]. OIL GAS-EUROPEAN MAGAZINE, 1999, 25 (04): : 12 - 12
  • [5] Study of Start-up of a Continuous Digester for Biogas Production
    Slimane, Kalloum
    Mohammed, Djaafri
    Kamel, Kaidi
    Mostafa, Khelafi
    Ahmed, Tahri
    Fethya, Salem
    Abdelkader, Touzi
    [J]. 2016 THE 4TH IEEE INTERNATIONAL CONFERENCE ON SMART ENERGY GRID ENGINEERING (SEGE), 2016, : 313 - 316
  • [6] Start-up of Biogas Plant with Inoculating Sludge Application
    Kogut, Pawel
    Piekarski, Jacek
    Ignatowicz, Katarzyna
    [J]. ROCZNIK OCHRONA SRODOWISKA, 2014, 16 : 534 - 545
  • [7] How real is the virtual start-up?
    Fay, Alexander
    [J]. ATP EDITION, 2011, (06): : 3 - 3
  • [8] Analysis of start-up process and implementation of start-up protection of a large synchronous condenser
    Li Z.
    Wu C.
    Wan L.
    Pan S.
    Wang H.
    Li W.
    [J]. Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2020, 48 (20): : 148 - 154
  • [9] Professionalization of the business start-up process
    Beresford, Richard
    Saunders, Mark N. K.
    [J]. STRATEGIC CHANGE-BRIEFINGS IN ENTREPRENEURIAL FINANCE, 2005, 14 (06): : 337 - 347
  • [10] The influence of the vehicle work organization conditions on the engine start-up parameters
    Droz´dziel, Pawel
    [J]. Eksploatacja i Niezawodnosc, 2008, 37 (01) : 72 - 74