Estimation of Cost Contingency for Air Force Construction Projects

被引:40
|
作者
Thal, Alfred E., Jr. [1 ]
Cook, Jason J. [2 ]
White, Edward D., III [3 ]
机构
[1] USAF, Dept Syst & Engn Management, Inst Technol, Wright Patterson AFB, OH 45433 USA
[2] Environm Branch, Colorado Springs, CO 80914 USA
[3] USAF, Dept Math & Stat, Inst Technol, Wright Patterson AFB, OH 45433 USA
关键词
Construction costs; Contingency; Construction management; RISK;
D O I
10.1061/(ASCE)CO.1943-7862.0000227
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk and associated cost overruns are critical problems for construction projects, yet the most common practice for dealing with them is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. Therefore, our goal was to identify significant variables that may influence, or serve as indicators of, potential cost overruns. We analyzed data from 203 Air Force construction projects over a full range of project types and scopes using multiple linear regression to develop a model to predict the amount of required contingency funds. The proposed model uses only data that would be available prior to the award of a construction contract. The variables in the model were categorized as project characteristics, design performance metrics, and contract award process influences. Based on the performance metric used, the model captures 44% of actual cost overruns versus the 20% captured by the current practice. Furthermore, application of the model reduces the average contingency budgeting error from 11.2 to only 0.3%.
引用
收藏
页码:1181 / 1188
页数:8
相关论文
共 50 条
  • [1] A cost estimation recommendation system for improved contingency management in construction projects
    Fatemeh Mostofi
    Vedat Toğan
    Onur Behzat Tokdemir
    Yusuf Arayici
    Neural Computing and Applications, 2025, 37 (5) : 3521 - 3538
  • [2] Owner Time and Cost Contingency Estimation for Building Construction Projects in Egypt
    Nawar, Seif
    Hosny, Ossama
    Nassar, Khaled
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 367 - 377
  • [3] Cost Contingency Estimation in Public Projects in the Construction Digitalisation Era: A Case of Vietnam
    Nguyen, Nhan T. T.
    Dang, Mai T. X.
    The-Quan Nguyen
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (05): : 106 - 115
  • [4] Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase
    Hoseini, Erfan
    Bosch-Rekveldt, Marian
    Hertogh, Marcel
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (06)
  • [5] Improving cost estimation in construction projects
    Sayed, Mohamed
    Abdel-Hamid, Mohamed
    El-Dash, Karim
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 135 - 143
  • [6] Cost Contingency Modelling for Construction Projects: Insight from the Literature
    Islam, Muhammad Saiful
    Nepal, Madhav Prasad
    Alam, Md Shah
    Arifuzzaman, Md.
    2019 INTERNATIONAL CONFERENCE ON INNOVATION AND INTELLIGENCE FOR INFORMATICS, COMPUTING, AND TECHNOLOGIES (3ICT), 2019,
  • [7] Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects
    Love, Peter E. D.
    Sing, Chun-Pong
    Carey, Brad
    Kim, Jeong Tai
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2015, 21 (02)
  • [8] Calculation of contingency in construction projects
    Touran, A
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2003, 50 (02) : 135 - 140
  • [9] DEVELOPING A TOOL FOR PROJECT CONTINGENCY ESTIMATION IN A LARGE PORTFOLIO OF CONSTRUCTION PROJECTS
    van Niekerk, M.
    Bekker, J.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2014, 25 (03) : 96 - 111
  • [10] Scope Definition of Air Force Design and Construction Projects
    Dicks, Evan
    Molenaar, Keith R.
    Gibson, G. Edward, Jr.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (05)