Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags

被引:7
|
作者
Hamdi, Imen [1 ]
Loukil, Taicir [1 ]
机构
[1] Univ Sfax, High Inst Ind Management, Res Unit LOGIQ, Sfax 3018, Tunisia
关键词
Scheduling; Permutation flowshop; Time lags; Upper bounds; Lower bounds; TARDY JOBS; NUMBER; ALGORITHM;
D O I
10.1007/s11590-014-0761-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider the problem of scheduling jobs in an -machine permutation flowshop with minimal time lags between consecutive operations of each job. The processing order of jobs is to be the same for each machine. The time lag is defined as the waiting time between two consecutive operations of each job. Upper bounds for the problem are provided by applying heuristic procedures based on known and new rules. Lower bounds based on Moore's algorithm and logic-based Benders decomposition are developed. For the last one, we define a long time horizon on the last machine divided into many segments of time. We combine a mixed integer linear programming to allocate jobs to time segments and scheduled using the constraint programming. Then, computational results are reported.
引用
收藏
页码:465 / 482
页数:18
相关论文
共 50 条
  • [1] Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags
    Imen Hamdi
    Taïcir Loukil
    Optimization Letters, 2015, 9 : 465 - 482
  • [2] Lagrangian relaxation for the permutation flowshop scheduling problem with minimal and maximal time lags
    Hamdi, Imen
    Loukil, Taicir
    2014 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2014, : 42 - 47
  • [3] Permutation flowshop scheduling problems with maximal and minimal time lags
    Fondrevelle, J
    Oulamara, A
    Portmann, MC
    COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (06) : 1540 - 1556
  • [4] New upper bounds for the permutation flowshop scheduling problem
    Jedrzejowicz, J
    Jedrzejowicz, P
    INNOVATIONS IN APPLIED ARTIFICIAL INTELLIGENCE, 2005, 3533 : 232 - 235
  • [5] Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags
    Imen Hamdi
    Taicir Loukil
    Operational Research, 2015, 15 : 95 - 114
  • [6] Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags
    Hamdi, Imen
    Loukil, Taicir
    OPERATIONAL RESEARCH, 2015, 15 (01) : 95 - 114
  • [7] Bounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness
    Hamdi, Imen
    Loukil, Taicir
    INTERNATIONAL JOURNAL OF COMBINATORIAL OPTIMIZATION PROBLEMS AND INFORMATICS, 2014, 5 (02): : 47 - 57
  • [8] Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
    E. Dhouib
    J. Teghem
    T. Loukil
    Annals of Operations Research, 2018, 267 : 101 - 134
  • [9] Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
    Dhouib, E.
    Teghem, J.
    Loukil, T.
    ANNALS OF OPERATIONS RESEARCH, 2018, 267 (1-2) : 101 - 134
  • [10] On some lower bounds for the permutation flowshop problem
    Gelvez, Sebastian Caceres
    Dang, Thu Huong
    Letchford, Adam N.
    COMPUTERS & OPERATIONS RESEARCH, 2023, 159