Study on Multi-Level Safety Risk Assessment of Two-Line Three-Step Construction of Long-Span Shallow Buried and Hidden Excavation Tunnel

被引:0
|
作者
Xiao, Miaowu [1 ]
Chang, Donghui [1 ]
Li, Jinzhou [1 ]
机构
[1] Third Engn Co Ltd CCCC Second Nav Bur, Runzhou Zhenjiang, Jiangsu, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction of long-span shallow buried and hidden excavation tunnel, the two-line three-step construction can avoid the risk caused by the structural system transformation during the demolition of temporary support. However, the two-line three-step method is applied to the underground tunnel construction technology is complicated, the stress system is complex, and the risk sources are numerous. Especially when crossing the soft and complex stratum and shallow tunnel buried and hidden excavation, the difficulty of tunnel deformation control and construction risk are significantly improved. To improve the safety risk control level in the construction process, the paper analyzes the risk factors of the two-line three-step construction of the long-span shallow buried and hidden excavation tunnel, carries out multi-level identification and fuzzy comprehensive evaluation of the risk factors, and determines the major risk sources. The results show that the construction process is a major and high-risk behavior, and the main risk is from management risk and technical risk, among which personnel management, safety education, and safety supervision are the biggest risk sources, and prevention work should be done for important risk points. The results of safety risk assessment have a high-reference value for the safety management practice of the two-line three-step construction of long-span shallow buried and hidden excavation tunnel.
引用
收藏
页码:73 / 84
页数:12
相关论文
共 5 条
  • [1] Informationized Observation of the Construction for the Shallow and Long-span Tunnel and Corresponding Safety Assessment
    Liu Xianshan
    Liu Xinrong
    DISASTER ADVANCES, 2012, 5 (04): : 1513 - 1519
  • [2] Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation
    Jin, Bao
    Liu, Yang
    Yang, Changxi
    Tan, Zhicheng
    Zhang, Jianyang
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2015, 2015
  • [3] Safety risk analysis and assessment of complex buildings in shallow-buried large-span tunnel construction
    Hou, Yanjuan
    Zhang, Dingli
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2007, 26 (SUPPL. 2): : 3718 - 3726
  • [4] Study on Multi-Level Safety Risk Assessment of Super 40 m Deep Foundation Pit Construction Adjacent to Subway
    Liang, Sen
    Zhang, Shilong
    Liao, Wei
    Liu, Changyong
    Tan, Zhijie
    Luo, Yingzhou
    Ai, Jiaojiao
    ICCREM 2022: Carbon Peak and Neutrality Strategies of the Construction Industry - Proceedings of the International Conference on Construction and Real Estate Management 2022, 2022, : 321 - 331
  • [5] Study on Multi-Level Safety Risk Assessment of Super 40 m Deep Foundation Pit Construction Adjacent to Subway
    Liang, Sen
    Zhang, Shilong
    Liao, Wei
    Liu, Changyong
    Tan, Zhijie
    Luo, Yingzhou
    Ai, Jiaojiao
    CARBON PEAK AND NEUTRALITY STRATEGIES OF THE CONSTRUCTION INDUSTRY (ICCREM 2022), 2022, : 321 - 331