Use of Lean Six Sigma to Improve Access to Care in a Surgical Subspecialty Clinic

被引:6
|
作者
Flanary, James T. [1 ]
Rocco, Nicholas R. [2 ]
Dougherty, Timothy [2 ]
Christman, Matthew S. [2 ]
机构
[1] Univ Minnesota, Sch Med, Minneapolis, MN 55455 USA
[2] Naval Med Ctr, Dept Urol, San Diego, CA USA
关键词
OUTPATIENT; EFFICIENCY;
D O I
10.1093/milmed/usz426
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
Introduction At the Naval Medical Center San Diego urology clinic, patients reported waiting for greater than 1 month for an initial consult. A Lean Six Sigma approach was used to improve access to care (ATC) and decrease variation in access by improving scheduling. Methods A Define-Measure-Analyze-Improve-Control approach was used. Delay to new patient visits was identified as the focus of intervention. The scheduling template was changed from a fixed stream to a modified wave based on simulation software analysis of appointment cycle times. Appointment length was adjusted based on cycle time analysis, and two rooms per clinician were used instead of one. The ratio of initial consults relative to established follow-ups and procedures was adjusted upward to better balance with the historic demand. Results Statistically significant improvement was seen in ATC and compliance with the Defense Health Agency (DHA) standard that new consults be seen within 28 days. Average days for a new consult to be seen were reduced by 7.2 days in the pediatric urology clinic (P < 0.0001) and 6.4 days in the adult urology clinic (P < 0.0001). Compliance with the Defense Health Agency 28-day ATC standard increased from a baseline of 69.2% to 88.9% and 61.7% to 84.4%, respectively, in the pediatric and adult clinics (P < 0.001 for both). Patient satisfaction was maintained at or above the goal threshold throughout the project. Conclusions An Lean Six Sigma model was used to improve timeliness of care for our patients, improving the overall quality of their healthcare experience. Simulation software can be used to model the clinic throughput and test alternative scheduling templates. ATC was significantly improved and patient satisfaction was maintained at or above goal thresholds.
引用
收藏
页码:E887 / E893
页数:7
相关论文
共 50 条
  • [1] LEAN SIX SIGMA TECHNIQUES TO IMPROVE OPHTHALMOLOGY CLINIC EFFICIENCY
    Ciulla, Thomas A.
    Tatikonda, Mohan V.
    ElMaraghi, Yehya A.
    Hussain, Rehan M.
    Hill, Amanda L.
    Clary, Julie M.
    Hattab, Eyas
    RETINA-THE JOURNAL OF RETINAL AND VITREOUS DISEASES, 2018, 38 (09): : 1688 - 1698
  • [2] Use of Lean Sigma Principles in a Tertiary Care Otolaryngology Clinic to Improve Efficiency
    Lin, Sandra Y.
    Gavney, Dean
    Ishman, Stacey L.
    Cady-Reh, Julie
    LARYNGOSCOPE, 2013, 123 (11): : 2643 - 2648
  • [3] Using Lean Six Sigma to Improve Performance in the Acute Care Setting
    Toney, Julie
    Winterhalter, Sandy
    Basting, Cassie
    JOURNAL OF ACUTE CARE PHYSICAL THERAPY, 2014, 5 (01) : 30 - 35
  • [4] Using Lean Six Sigma to Improve Performance in the Acute Care Setting
    Smith, James M.
    JOURNAL OF ACUTE CARE PHYSICAL THERAPY, 2014, 5 (02) : 48 - 49
  • [5] USING LEAN / SIX-SIGMA METHODOLOGY TO ACHIEVE IMPROVED ACCESS IN A UROLOGY CLINIC
    Stevenson, Bradford
    Tieu, Thomas
    Baldini, Teri
    Gonzalez, Chris
    Kohler, Tobias
    McVary, Kevin
    JOURNAL OF UROLOGY, 2015, 193 (04): : E169 - E169
  • [6] Use of six sigma to improve pharmacist dispensing errors at an outpatient clinic
    Chan, ALF
    AMERICAN JOURNAL OF MEDICAL QUALITY, 2004, 19 (03) : 128 - 131
  • [7] Using Lean Six Sigma to Improve Pneumococcal Vaccination Rates in a Veterans Affairs Rheumatology Clinic
    Wilson, Jaime
    Swee, Melissa
    Mosher, Hilary
    Scott-Cawiezell, Jill
    Levins, Lori
    Fort, Krista
    Kumar, Bharat
    JOURNAL FOR HEALTHCARE QUALITY, 2020, 42 (03) : 166 - 174
  • [8] Using Lean Six Sigma to improve investment behavior
    Peteros, Randall G.
    Maleyeff, John
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2015, 6 (01) : 59 - 72
  • [9] Lean Six Sigma to improve a cement production process
    Fidan, Evrim Yavuz, 2018, Bauverlag BV GmbH (71):
  • [10] Lean Six Sigma to improve a cement production process
    Fidan, Evrim Yavuz
    ZKG INTERNATIONAL, 2018, 71 (04): : 60 - 66