A New Gob-Side Entry Retaining Approach with Reinforced Filling Gangue Wall in Thin Coal Seam

被引:1
|
作者
Duan, Huiqiang [1 ]
Sun, Ming [1 ]
Li, Qing [1 ]
机构
[1] Inner Mongolia Univ Sci & Tech, Sch Mining & Coal, 7 Arding St, Baotou, Peoples R China
关键词
Thin coal seam; Gob-side entry retaining; Gangue backfilling; Filling wall reinforcement; Coupling support;
D O I
10.1007/s10706-019-00874-5
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Gob-side entry retaining technology is an effective method for sustainable exploitation of coal resources and has been widely used in China. However, there are a large surrounding rock deformation and hard support in the gob-side entry retaining. In this paper, take the gob-side entry retaining in thin coal seam from Jiyang Coal Mine as the engineering background. Firstly, using FLAC software to simulate and analyze the deformation and stress distribution of gob-side entry surrounding rock in different schemes. Secondly, a new coupling support method was put forward after taking full consideration of the simulation results and field engineering experiences, namely: "bolt-mesh-anchor" for basic support, single hydraulic props as reinforced support of gob-side entry, and reinforced filling wall with bolts. In-situ engineering practices showed that this method has a good effect on controlling the deformation of gob-side entry surrounding rock and creates the better conditions for normal production of the working face.
引用
收藏
页码:883 / 895
页数:13
相关论文
共 50 条
  • [1] A New Gob-Side Entry Retaining Approach with Reinforced Filling Gangue Wall in Thin Coal Seam
    Huiqiang Duan
    Ming Sun
    Qing Li
    Geotechnical and Geological Engineering, 2020, 38 : 883 - 895
  • [2] Research on cut gob-side entry retaining in thin coal seam of Tangshan ditch
    Zhang G.
    Xu Y.
    Ge P.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2016, 35 (07): : 1397 - 1406
  • [3] Feasibility Analysis of Gob-Side Entry Retaining in Steep Coal Seam
    Deng Yuehua
    Wang Shouquan
    Fan Yingchong
    Chen Xiankun
    2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 608 - 611
  • [4] An Innovative Approach for Gob-Side Entry Retaining in Thick Coal Seam Longwall Mining
    He, Manchao
    Gao, Yubing
    Yang, Jun
    Gong, Weili
    ENERGIES, 2017, 10 (11):
  • [5] Key Parameters of Gob-Side Entry Retaining in A Gassy and Thin Coal Seam with Hard Roof
    Yan, Shuai
    Liu, Tianxiao
    Bai, Jianbiao
    Wu, Wenda
    PROCESSES, 2018, 6 (05):
  • [6] Technology of Gob-side Entry Retaining in Steep Soft Outburst Coal Seam
    Shi, Yongkui
    Yuan, Hu
    Wang, Huanming
    INTERNATIONAL MINING FORUM 2010: MINE SAFETY AND EFFICIENT EXPLOITATION FACING CHALLENGE OF THE 21ST CENTURY, 2010, : 91 - +
  • [7] Analysis on supporting performance of the high-water material filling body in the gob-side entry retaining of thin coal seam
    Guo, Zhongping
    Chen, Daozhi
    Guo, Feng
    Wang, Yan
    SUSTAINABLE DEVELOPMENT OF NATURAL RESOURCES, PTS 1-3, 2013, 616-618 : 316 - 319
  • [8] Distribution Law of Mining Stress of the Gob-Side Entry Retaining in Deep Mining Thin Coal Seam
    Qin, Tao
    Ren, Kai
    Jiang, Chen
    Duan, Yanwei
    Liu, Zhi
    Wang, Lei
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [9] Filling wall mechanical analysis of gob-side entry retaining with composite roof
    Peng Yang
    Zhiguo Huang
    Xiao Liu
    Sen Yang
    Arabian Journal of Geosciences, 2022, 15 (2)
  • [10] Feasibility analysis of gob-side entry retaining on a working face in a steep coal seam
    Deng Yuehua
    Wang Shouquan
    InternationalJournalofMiningScienceandTechnology, 2014, 24 (04) : 499 - 503