共 50 条
- [3] Robust Resource Investment Problem with Time-Dependent Resource Cost and Tardiness Penalty 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1693 - 1698
- [5] Non-Greedy Heuristics and an Adaptive Metaheuristic for the Multi-mode Resource Constrained Project Scheduling Problem PROCEEDINGS OF 2009 CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE & SYSTEM DYNAMICS, VOL 4, 2009, : 207 - 213
- [7] The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds OR Spectrum, 2020, 42 : 901 - 933
- [9] Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies TOP, 2017, 25 : 49 - 79