Open pit mine planning with degradation due to stockpiling

被引:14
|
作者
Rezakhah, Mojtaba [1 ]
Newman, Alexandra [2 ]
机构
[1] Tarbiat Modares Univ, Engn Dept, POB 14115-111, Tehran, Iran
[2] Colorado Sch Mines, Dept Mech Engn, Operat Res Engn Program, Golden, CO 80401 USA
关键词
Stockpiling; Linear and integer programming; Mine planning; Open pit mining; Degradation; MODEL;
D O I
10.1016/j.cor.2018.11.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The open pit mine production scheduling with stockpiling (OPMPS+S) problem decides when to extract each notional, three-dimensional block of ore and/or waste in a deposit. In addition, this problem determines whether to send each block to a processing plant, to a stockpile, or to a waste dump. The objective function maximizes net present value, subject to constraints such as precedence, and capacities for mining and processing. Because the material within the stockpile is exposed to the environment, time-dependent changes may occur in the material's properties, which results in increased processing costs or, equivalently, a net loss of value. We extend a linear-integer mine-planning model that considers stockpiling to account for degradation within the stockpile(s). We compare results from this model on a data set from an operational mine to more commonly used, yet less detailed, models that provide lower and upper bounds on the net present value. We show that the material degradation within a stockpile has an impact on the value that a stockpile provides. Specifically, by considering 5% and 10% annual degradation for our instances, we observe that the value that a stockpile provides decreases by 37% and 69%, respectively, relative to the computed value of a stockpile without degradation. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Practical performance of an open pit mine scheduling model considering blending and stockpiling
    Rezakhah, Mojtaba
    Moreno, Eduardo
    Newman, Alexandra
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2020, 115
  • [2] A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling
    Fathollahzadeh, Karo
    Mardaneh, Elham
    Cigla, Mehmet
    Asad, Mohammad Waqar Ali
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2021, 31 (04) : 717 - 728
  • [3] A mathematical model for open pit mine production scheduling with Grade Engineering~? and stockpiling
    Karo Fathollahzadeh
    Elham Mardaneh
    Mehmet Cigla
    Mohammad Waqar Ali Asad
    [J]. International Journal of Mining Science and Technology, 2021, 31 (04) : 717 - 728
  • [4] Linear models for stockpiling in open-pit mine production scheduling problems
    Moreno, Eduardo
    Rezakhah, Mojtaba
    Newman, Alexandra
    Ferreira, Felipe
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 260 (01) : 212 - 221
  • [5] Risk analysis in open pit mine planning
    Seymour, C
    [J]. AUSIMM'98: THE MINING CYCLE, 1998, 98 (02): : 129 - 134
  • [6] A continuous framework for open pit mine planning
    Alvarez, Felipe
    Amaya, Jorge
    Griewank, Andreas
    Strogies, Nikolai
    [J]. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2011, 73 (01) : 29 - 54
  • [7] OPEN-PIT PLANNING AT ADAMS MINE
    WEST, FJ
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1966, 59 (647): : 329 - &
  • [8] A continuous framework for open pit mine planning
    Felipe Alvarez
    Jorge Amaya
    Andreas Griewank
    Nikolai Strogies
    [J]. Mathematical Methods of Operations Research, 2011, 73 : 29 - 54
  • [9] A simulated annealing based approach for open pit mine production scheduling with stockpiling option
    Danish, Abid Ali Khan
    Khan, Asif
    Muhammad, Khan
    Ahmad, Waqas
    Salman, Saad
    [J]. RESOURCES POLICY, 2021, 71
  • [10] Computer-aided mine planning for an open-pit mine
    Solanki, M.K.S.
    Kanodia, H.K.
    [J]. Journal of the Institution of Engineers (India), Part MI: Mining Engineering Division, 1990, 71 (02):