A production scheduling problem using genetic algorithm

被引:18
|
作者
Knosala, R [1 ]
Wal, T [1 ]
机构
[1] Silesian Tech Univ, Fac Mech Engn, PL-4410 Gliwice, Poland
关键词
genetic algorithms; scheduling;
D O I
10.1016/S0924-0136(00)00780-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The way of flexible manufacturing cell work scheduling with the aid of genetic algorithm and draft of code strings, which are used by this algorithm, have been presented in this paper. Moreover, some results obtained by computer program based on this method also have been presented. In first case it has been assumed that the cell works in optional mode - every operation can be done on every machine, and in second case cell works in sequential mode - the first operation is executed on the first machine, the second operation on the second machine and so on. The only criterion of schedule evaluation is the time of cell work. This time must be the shortest for definite number of jobs and machines. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:90 / 95
页数:6
相关论文
共 50 条
  • [1] Modeling Production Scheduling Problem and Its Solution by Genetic Algorithm
    Chen, Tinggui
    Zhou, Guanglan
    [J]. JOURNAL OF COMPUTERS, 2013, 8 (08) : 2126 - 2133
  • [2] An Improved Genetic Algorithm for Production Planning and Scheduling Optimization Problem
    Kunapareddy, Aditya
    Allaka, Gopichand
    [J]. INTELLIGENT MANUFACTURING AND ENERGY SUSTAINABILITY, ICIMES 2019, 2020, 169 : 157 - 171
  • [3] TABU SEARCH AND GENETIC ALGORITHM FOR PRODUCTION PROCESS SCHEDULING PROBLEM
    Burduk, Anna
    Musial, Kamil
    Kochanska, Joanna
    Gornicka, Dagmara
    Stetsenko, Anastasia
    [J]. LOGFORUM, 2019, 15 (02) : 181 - 189
  • [4] Computational study on scheduling problem using genetic algorithm
    Juan, Nelly
    Marin, Sary
    Iranzo, Alexis
    [J]. BULLETIN OF COMPUTATIONAL APPLIED MATHEMATICS, 2019, 7 (01): : 9 - 14
  • [5] Solving batch production scheduling using genetic algorithm
    Wu, LY
    Hu, YD
    Xu, DM
    Hua, B
    [J]. PROCESS SYSTEMS ENGINEERING 2003, PTS A AND B, 2003, 15 : 648 - 653
  • [6] An intelligent production planning and scheduling using genetic algorithm
    Qi, JG
    Burns, GR
    Harrison, DK
    [J]. ADVANCES IN MANUFACTURING TECHNOLOGY XII, 1998, : 271 - 276
  • [7] A genetic algorithm for solving a production and delivery scheduling problem with time windows
    Garcia, JM
    Lozano, S
    Guerrero, F
    Eguia, I
    [J]. ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2002, PROCEEDINGS, 2002, 2527 : 371 - 380
  • [8] Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
    Li, Y
    Ip, WH
    Wang, DW
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 54 (01) : 65 - 76
  • [9] Solving an Industrial Shop Scheduling Problem Using Genetic Algorithm
    Moghadam, Ali Mokhtari
    Wong, Kuan Yew
    Piroozfard, Hamed
    Asl, Ali Derakhshan
    Hutajulu, Tiurmai Shanty
    [J]. MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING RESEARCH ADVANCES 1.1, 2014, 845 : 564 - 568
  • [10] A REAL-WORLD SCHEDULING PROBLEM USING GENETIC ALGORITHM
    GILKINSON, JC
    RABELO, LC
    BUSH, BO
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 29 : 177 - 181