Stream flow simulation and verification in ungauged zones by coupling hydrological and hydrodynamic models: a case study of the Poyang Lake ungauged zone

被引:35
|
作者
Zhang, Ling [1 ]
Lu, Jianzhong [1 ]
Chen, Xiaoling [1 ,2 ]
Liang, Dong [1 ]
Fu, Xiaokang [1 ]
Sauvage, Sabine [3 ]
Perez, Jose-Miguel Sanchez [3 ]
机构
[1] Wuhan Univ, State Key Lab Informat Engn Surveying Mapping & R, Wuhan 430079, Hubei, Peoples R China
[2] Jiangxi Normal Univ, Minist Educ, Key Lab Poyang Lake Wetland & Watershed Res, Nanchang 330022, Jiangxi, Peoples R China
[3] Univ Toulouse, CNRS, INPT, ECOLAB,UPS, F-31400 Toulouse, France
关键词
WATER; BASIN; FREQUENCY; TANA;
D O I
10.5194/hess-21-5847-2017
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
To solve the problem of estimating and verifying stream flow without direct observation data, we estimated stream flow in ungauged zones by coupling a hydrological model with a hydrodynamic model, using the Poyang Lake basin as a test case. To simulate the stream flow of the ungauged zone, we built a soil and water assessment tool (SWAT) model for the entire catchment area covering the upstream gauged area and ungauged zone, and then calibrated the SWAT model using the data in the gauged area. To verify the results, we built two hydrodynamic scenarios (the original and adjusted scenarios) for Poyang Lake using the Delft3D model. In the original scenario, the upstream boundary condition is the observed stream flow from the upstream gauged area, while, in the adjusted scenario, it is the sum of the observed stream flow from the gauged area and the simulated stream flow from the ungauged zone. The experimental results showed that there is a stronger correlation and lower bias (R-2 = 0.81, PBIAS = 10.00 %) between the observed and simulated stream flow in the adjusted scenario compared to that (R-2 = 0.77, PBIAS = 20.10 %) in the original scenario, suggesting the simulated stream flow of the ungauged zone is reasonable. Using this method, we estimated the stream flow of the Poyang Lake ungauged zone as 16.4 +/- 6.2 billion m(3) a(-1), representing similar to 11.24% of the annual total water yield of the entire watershed. Of the annual water yield, 70% (11.48 billion m(3) a(-1)) is concentrated in the wet season, while 30% (4.92 billion m(3) a(-1)) comes from the dry season. The ungauged stream flow significantly improves the water balance with the closing error decreased by 13.48 billion m(3) a(-1) (10.10% of the total annual water resource) from 30.20 +/- 9.1 billion m(3) a(-1) (20.10% of the total annual water resource) to 16.72 +/- 8.53 billion m(3) a(-1) (10.00% of the total annual water resource). The method can be extended to other lake, river, or ocean basins where observation data is unavailable.
引用
收藏
页码:5847 / 5861
页数:15
相关论文
共 11 条
  • [1] Estimation of flow in ungauged catchments by coupling a hydrological model and neural networks: case study
    Saliha, A. H.
    Awulachew, S. B.
    Cullmann, J.
    Horlacher, Hans-B.
    [J]. HYDROLOGY RESEARCH, 2011, 42 (05): : 386 - 400
  • [2] A framework of integrated hydrological and hydrodynamic models using synthetic rainfall for flash flood hazard mapping of ungauged catchments in tropical zones
    Lohpaisankrit, Worapong
    Meon, Guenter
    Tingsanchali, Tawatchai
    [J]. SPATIAL DIMENSIONS OF WATER MANAGEMENT - REDISTRIBUTION OF BENEFITS AND RISKS, 2016, 373 : 183 - 187
  • [3] Simulation of river discharge in ungauged catchments by forcing GLDAS products to a hydrological model (a case study: Polroud basin, Iran)
    Khasmakhi, Hadis Pakdel
    Vazifedoust, Majid
    Marofi, Safar
    Tizro, Abdollah Taheri
    [J]. WATER SUPPLY, 2020, 20 (01) : 277 - 286
  • [4] Calibration of hydrological models for ungauged catchments by automatic clustering using a differential evolution algorithm: the Gorganrood river basin case study
    Alizadeh, Zahra
    Yazdi, Jafar
    [J]. JOURNAL OF HYDROINFORMATICS, 2023, 25 (03) : 645 - 662
  • [5] Stream flow modeling for a karst basin using coupled hydrological-hydrodynamic models: Case study of Lijiang River, China
    Wu, Q. F.
    Cai, Y.
    Liu, S. G.
    Jiang, Y. M.
    Makhinov, A. N.
    Makhinova, A. F.
    [J]. RIVER SEDIMENTATION, 2017, : 36 - 36
  • [6] Development of a Hydrological Boundary Method for the River-Lake Transition Zone Based on Flow Velocity Gradients, and Case Study of Baiyangdian Lake Transition Zones, China
    Tian, Kai
    Yang, Wei
    Zhao, Yan-wei
    Yin, Xin-an
    Cui, Bao-shan
    Yang, Zhi-feng
    [J]. WATER, 2020, 12 (03)
  • [7] Improving streamflow simulation in Dongting Lake Basin by coupling hydrological and hydrodynamic models and considering water yields in data-scarce areas
    Long, Yuannan
    Chen, Wenwu
    Jiang, Changbo
    Huang, Zhiyong
    Yan, Shixiong
    Wen, Xiaofeng
    [J]. JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2023, 47
  • [8] Flood hazard delineation in an ungauged catchment by coupling hydrologic and hydraulic models with geospatial techniques—a case study of Koraiyar basin, Tiruchirappalli City, Tamil Nadu, India
    Surendar Natarajan
    Nisha Radhakrishnan
    [J]. Environmental Monitoring and Assessment, 2020, 192
  • [10] Flood hazard delineation in an ungauged catchment by coupling hydrologic and hydraulic models with geospatial techniques-a case study of Koraiyar basin, Tiruchirappalli City, Tamil Nadu, India
    Natarajan, Surendar
    Radhakrishnan, Nisha
    [J]. ENVIRONMENTAL MONITORING AND ASSESSMENT, 2020, 192 (11)