Development of TWA mock-up for TITAN

被引:0
|
作者
Li, Jiahao [1 ,2 ]
Ragona, R. [3 ]
Song, Yuntao [2 ]
Yang, Qingxi [2 ]
Yu, Chao [2 ]
Hillairet, J. [4 ]
Batal, T. [4 ]
Bernard, J. M. [4 ]
Chen, Zhaoxi [2 ]
Xu, Hao [2 ]
Chen, Jian [2 ]
Chen, Shilin [2 ]
Li, Ning [2 ]
机构
[1] Univ Sci & Technol China, Hefei 230026, Peoples R China
[2] Chinese Acad Sci, Inst Plasma Phys, Hefei 230031, Peoples R China
[3] Lab Plasma Phys, LPP ERM KMS, B-1000 Brussels, Belgium
[4] CEA, IRFM, F-13108 St Paul Les Durance, France
关键词
TWA; ICRH; RF analysis; Structure analysis; assembly; WEST; ANTENNA;
D O I
10.1016/j.fusengdes.2021.112549
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The challenge of tokamak auxiliary heating method ICRH is to couple large amount of power through the plasma boundary, where an evanescence layer has to be crossed, without exceeding the voltage standoff at the antenna. Travelling Wave Array antenna has been proposed for ICRH of future fusion reactor such as DEMO in view to decrease the antenna power density. However, so far the voltage standoff of a TWA antenna in the ICRH frequency range (30-60 MHz) has never been demonstrated. A TWA mock-up has been designed and will be tested in the CEA/IRFM testbed TITAN to assess its compatibility to RF high power operation. In this paper, the main characteristics of the TWA mock-up are reported in detail. In addition, some near-field RF analyses are presented, containing reflection characteristics, port voltage, electric field and k(//) spectrum. Meanwhile, the structural evaluation of the antenna during its lifting process is carried out to check with safety requirements. The assembly strategy of the whole structure is also explained elaborately to ensure the fluency and correct integration of the TWA mock-up. Finally, the RF assessment of antenna straps critical dimensions is briefly described.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] RF network analysis of the WEST TWA mock-up in TITAN
    Ragona, R.
    Hillairet, J.
    Durodie, F.
    Yu, C.
    Mollard, P.
    Yang, Q.
    Xu, H.
    Batal, T.
    Li, J.
    Messiaen, A.
    Bernard, J-M.
    Lombard, G.
    Song, Y.
    [J]. FUSION ENGINEERING AND DESIGN, 2021, 168
  • [2] DEVELOPMENT OF A CIRCULATION MOCK-UP
    WALLNER, F
    [J]. LANGENBECKS ARCHIV FUR CHIRURGIE, 1974, 335 (1-3): : 61 - 65
  • [3] Electronic mock-up
    Bradley, AJ
    [J]. GAS TURBINES, 1997, 97 (13): : 17 - 27
  • [4] Mock-up centre
    不详
    [J]. AIRCRAFT ENGINEERING AND AEROSPACE TECHNOLOGY, 1998, 70 (06): : 510 - 510
  • [5] The mock-up of rehearsals
    Perroux, Alain
    [J]. AVANT SCENE OPERA, 2015, (289): : 120 - 120
  • [6] Memory Mock-Up
    Mills, Tyler
    [J]. SOUTH DAKOTA REVIEW, 2012, 50 : 20 - 22
  • [7] Virtual Mock-Up Hybrid Electric Vehicle Development
    Croitorescu, V.
    Oprean, M.
    Anthonis, J.
    [J]. SUSTAINABLE AUTOMOTIVE TECHNOLOGIES 2013, 2014, : 299 - 305
  • [8] Development of the ITER IOIS assembly tool and mock-up
    Nam, Kyoungo
    Kim, Dongjin
    Park, Hyunki
    Ahn, Heejae
    Kim, Kyoungkyu
    Yoo, Yongsoo
    Watson, Emma
    Shaw, Robert
    [J]. FUSION ENGINEERING AND DESIGN, 2014, 89 (9-10) : 2155 - 2158
  • [9] Development of ITER sector assembly tools and mock-up
    Nam, Kyoungo
    Park, Hyunki
    Kim, Dongjin
    Kim, Kyoungkyu
    Kim, Byungseok
    Ahn, Heejae
    Bak, Jooshik
    Im, Kihak
    Shaw, Robert
    [J]. FUSION ENGINEERING AND DESIGN, 2012, 87 (7-8) : 1268 - 1272
  • [10] A shorter product development time with digital mock-up
    Rooks, B
    [J]. ASSEMBLY AUTOMATION, 1998, 18 (01) : 34 - +