Makespan minimization scheduling with ready times, group technology and shortening job processing times

被引:9
|
作者
Wang, Ji-Bo [1 ]
Liu, Lu [2 ]
Wang, Jian-Jun [2 ]
Li, Lin [1 ]
机构
[1] Shenyang Aerosp Univ, Sch Sci, Shenyang 110136, Liaoning, Peoples R China
[2] Dalian Univ Technol, Fac Management & Econ, Dalian 116024, Peoples R China
来源
COMPUTER JOURNAL | 2018年 / 61卷 / 09期
基金
中国国家自然科学基金;
关键词
scheduling; group technology; shortening job processing times; ready time; DECREASING LINEAR DETERIORATION; SINGLE-MACHINE; RELEASE DATES; TOTAL TARDINESS; FLOW TIME; COMPLEXITY; HEURISTICS; ALGORITHM; SUBJECT;
D O I
10.1093/comjnl/bxy007
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
We investigate a group scheduling problem with shortening job processing times on a single machine in which the shortening is proportional-linear shortening and the setup time of a group is fixed. For the maximum completion time (i.e. the makespan) minimization problem with ready times, we show that the general case of the problem can be solved in polynomial time if the number of groups is a given constant. We also prove that some special cases of the problem can be optimally solved by a lower order algorithm respectively.
引用
收藏
页码:1422 / 1428
页数:7
相关论文
共 50 条
  • [1] Single-machine makespan minimization scheduling with nonlinear shortening processing times
    Wang, Ming-Zheng
    Wang, Ji-Bo
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (03) : 659 - 663
  • [2] Group scheduling with independent setup times, ready times, and deteriorating job processing times
    Wang, Ji-Bo
    Huang, Xue
    Wu, Yu-Bin
    Ji, Ping
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (5-8): : 643 - 649
  • [3] Group scheduling with independent setup times, ready times, and deteriorating job processing times
    Ji-Bo Wang
    Xue Huang
    Yu-Bin Wu
    Ping Ji
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 60 : 643 - 649
  • [4] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (9-12): : 1119 - 1128
  • [5] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Purushothaman Damodaran
    Mario C. Velez-Gallego
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 1119 - 1128
  • [6] Scheduling with controllable release dates and processing times: Makespan minimization
    Cheng, T. C. Edwin
    Kovalyov, Mikhail Y.
    Shakhlevich, Natalia V.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 751 - 768
  • [7] Single Machine Group Scheduling with Position Dependent Processing Times and Ready Times
    Zhang, Xingong
    Xie, Qiulian
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [8] Single machine group scheduling with time dependent processing times and ready times
    Wang, Ji-Bo
    Wang, Jian-Jun
    [J]. INFORMATION SCIENCES, 2014, 275 : 226 - 231
  • [9] Makespan minimization in single-machine scheduling with step-deterioration of processing times
    Jeng, AAK
    Lin, BMT
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (03) : 247 - 256
  • [10] Makespan minimization for scheduling unrelated parallel machines with setup times
    Kuo-Ching Ying
    Zne-Jung Lee
    Shih-Wei Lin
    [J]. Journal of Intelligent Manufacturing, 2012, 23 : 1795 - 1803