Incentive efficient control of a make-to-stock production system

被引:29
|
作者
Plambeck, EL [1 ]
Zenios, SA [1 ]
机构
[1] Stanford Univ, Grad Sch Business, Stanford, CA 94305 USA
关键词
D O I
10.1287/opre.51.3.371.14954
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers a principal-agent variant of the classical make-to-stock single-server queueing system. The principal incurs, all costs for holding inventory and backordering demand. The agent dynamically controls the production rate at the server and incurs a convex production cost. The principal cannot monitor the production rate but can draw inference from increases in the inventory level. Furthermore, by making payments contingent on the inventory level, the principal motivates the agent to control the production rate in a manner that will minimize the principal's own total expected discounted cost. We show that an optimal incentive payment scheme consists of piece rates and inventory penalties that vary dynamically with the inventory level. This scheme coordinates the system if the agent is risk neutral. Otherwise. operational performance is degraded by the conflict in incentives between principal and agent. We identify some drivers of this agency loss: In addition to discounting and risk aversion in the agent's preferences, which are standard causes of friction in dynamic agency models, an increasing marginal cost of production and slack in the agent's capacity are also found to be lead contributors. Heavy traffic analysis supports these findings through closed-form expressions for the performance of the system under the optimal incentive scheme.
引用
收藏
页码:371 / 386
页数:16
相关论文
共 50 条
  • [1] Production control and stock rationing for a make-to-stock system with parallel production channels
    Bulut, Onder
    Fadiloglu, Mehmet Murat
    [J]. IIE TRANSACTIONS, 2011, 43 (06) : 432 - 450
  • [2] Optimal admission control and sequencing in a make-to-stock/make-to-order production system
    Carr, S
    Duenyas, I
    [J]. OPERATIONS RESEARCH, 2000, 48 (05) : 709 - 720
  • [3] On a make-to-stock production/mountain modeln with hysteretic control
    Boxma, O.
    Loepker, A.
    Perry, D.
    [J]. ANNALS OF OPERATIONS RESEARCH, 2016, 241 (1-2) : 53 - 82
  • [4] Control of make-to-stock production systems with setup costs
    Ozkan, Sinem
    Bulut, Onder
    [J]. JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2020, 35 (03): : 1199 - 1212
  • [5] On a make-to-stock production/mountain modeln with hysteretic control
    O. Boxma
    A. Löpker
    D. Perry
    [J]. Annals of Operations Research, 2016, 241 : 53 - 82
  • [6] Material Flow Optimization for Make-to-Stock Production System
    ZHANG Bi-xi
    [J]. 厦门大学学报(自然科学版), 2002, (S1) : 232 - 233
  • [7] Combined make-to-order and make-to-stock in a food production system
    Soman, CA
    van Donk, DP
    Gaalman, G
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (02) : 223 - 235
  • [8] Energy-efficient production control of a make-to-stock system with buffer- and time-based policies
    Tan, Baris
    Karabag, Oktay
    Khayyati, Siamak
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (16) : 5809 - 5827
  • [9] Subcontracting in a make-to-stock production system, IPA gradients for an SFM
    Al-Shihabi, S
    [J]. Proceedings of the 2005 Winter Simulation Conference, Vols 1-4, 2005, : 819 - 824
  • [10] The impact of adding a make-to-order item to a make-to-stock production system
    Federgruen, A
    Katalan, Z
    [J]. MANAGEMENT SCIENCE, 1999, 45 (07) : 980 - 994