Profit-Based Unit Commitment Problem Using PSO with Modified Dynamic Programming

被引:0
|
作者
Shukla, Anup [1 ]
Lal, Vivek Nandan [1 ]
Singh, S. N. [1 ]
机构
[1] Indian Inst Technol, Dept Elect Engn, Kanpur, Uttar Pradesh, India
关键词
Competitive environment; profit-base unit commitment problem; dynamic programming; particle swarm optimization;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a hybrid approach utilizing particle swarm optimization along with dynamic programming to solve unit commitment problem based on the profit under the deregulated power market. In the deregulated market, power and reserve prices are important factors in the decision process for unit commitment scheduling and offer freedom to utilities to schedule their generators to produce less than predicted load as well as reserve to maximize their profit. To solve the profit based unit commitment problem (PBUCP), the model is divided into exterior and interior dependent sub problems, which are discrete and continuous, respectively. The proposed model helps GENCOs to make a decision, how much power and reserve that must be put up for sale in the market, and how to schedule generators in order to receive the maximum profit. GENCOs with 3 and 10 generating units are used to demonstrate the effectiveness of the proposed approach.
引用
下载
收藏
页数:6
相关论文
共 50 条
  • [1] Profit-based unit commitment problem with bilateral contracts
    Bisanovic S.
    Hajro M.
    Dlakic M.
    International Journal of Power and Energy Systems, 2011, 31 (02): : 87 - 95
  • [2] A sequential evolutionary programming approach to profit-based unit commitment
    Contreras-Hernandez, E. J.
    Cedeno-Maldonado, J. R.
    2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: LATIN AMERICA, VOLS 1-3, 2006, : 1112 - +
  • [3] Modified Genetic Algorithm for the Profit-Based Unit Commitment Problem in Competitive Electricity Market
    Nepomuceno, Lucas Santiago
    de Oliveira, Layon Mescolin
    da Silva Junior, Ivo Chaves
    de Oliveira, Edimar Jose
    de Paula, Arthur Neves
    ENERGIES, 2023, 16 (23)
  • [4] An MILP Approach for a Profit-Based Unit Commitment Problem with Emissions Penalty
    Che, Ping
    Shi, Gang
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4474 - 4477
  • [5] Swarm Intelligence to the Solution of Profit-Based Unit Commitment Problem with Emission Limitations
    D. Sam Harison
    T. Sreerengaraja
    Arabian Journal for Science and Engineering, 2013, 38 : 1415 - 1425
  • [6] Swarm Intelligence to the Solution of Profit-Based Unit Commitment Problem with Emission Limitations
    Harison, D. Sam
    Sreerengaraja, T.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (06) : 1415 - 1425
  • [7] Application of Particle Swarm Optimization technique to a profit-based Unit Commitment problem
    Sriyanyong P.
    ICETC 2010 - 2010 2nd International Conference on Education Technology and Computer, 2010, 4 : V4160 - V4166
  • [8] Profit-based unit commitment solutions in a competitive market
    Calabro, F.
    Casolino, G. M.
    Losi, A.
    Russo, M.
    PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON OPTIMIZATION OF ELECTRICAL AND ELECTRONIC EQUIPMENT, VOL I: ELECTROTECHNICS, 2006, : 177 - 182
  • [9] A profit-based unit commitment CA for the competitive environment
    Richter, CW
    Sheblé, GB
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) : 715 - 721
  • [10] Profit-based unit commitment problem: A review of models, methods, challenges, and future directions
    Abdi, Hamdi
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 138