Multi-Objective Migrating Birds Optimization Algorithm for Stochastic Lot-Streaming Flow Shop Scheduling with Blocking

被引:42
|
作者
Han, Yuyan [1 ]
Li, Jun-Qing [2 ]
Gong, Dunwei [3 ]
Sang, Hongyan [1 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng 252059, Peoples R China
[2] Shandong Normal Univ, Sch Informat & Engn, Jinan 250014, Shandong, Peoples R China
[3] China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; multi-objective; blocking lot-streaming flow shop; stochastic processing time; migrating birds optimization; BEE COLONY ALGORITHM; JOB-SHOP; PROCESSING TIMES; MONTE-CARLO; HEURISTICS; PERFORMANCE; MAKESPAN;
D O I
10.1109/ACCESS.2018.2889373
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Blocking lot-streaming flow shop scheduling problem with the stochastic processing time has a wide range of applications in various industrial systems. However, this problem has not yet been well studied. In this paper, the above-mentioned problem is transformed into a determinate multi-objective optimization one using the Monte Carlo sampling method. A Multi-Objective Migrating Birds Optimization (MOMBO) algorithm is then proposed to solve the above-mentioned re-formulated multi-objective scheduling problem, in which the multiple-based PFE is proposed to yield the initial solutions with high quality, the information of the non-dominated solutions is learned and sampled to improve the global searching ability of MOMBO, and a reference-point-assisted local search method for multi-objective optimization is applied to further enhance the exploitation capability of MOMBO. To evaluate the performance of the MOMBO, several comparative experiments are executed on 180 test scheduling instances. The experimental results demonstrate that the MOMBO outperforms the compared algorithms in convergence and distributivity and has capacities to tackle the uncertainties.
引用
收藏
页码:5946 / 5962
页数:17
相关论文
共 50 条
  • [1] Migrating Birds Optimization for Lot-streaming flow shop scheduling problem
    Han, Yuyan
    Li, Junqing
    Liu, Yiping
    Zheng, Zhixin
    Pan, Yuxia
    Sang, Hongyan
    Liu, Lili
    [J]. 2019 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2019, : 667 - 672
  • [2] An Improved Discrete Migrating Birds Optimization for Lot-Streaming Flow Shop Scheduling Problem with Blocking
    Han, Yuyan
    Li, Junqing
    Sang, Hongyan
    Tian, Tian
    Bao, Yun
    Sun, Qun
    [J]. INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 780 - 791
  • [3] An Enhanced Migrating Birds Optimization for a Lot-streaming Flow Shop Scheduling Problem
    Meng, Tao
    Duan, Jun-hua
    Pan, Quan-ke
    Chen, Qing-da
    [J]. 2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 4687 - 4691
  • [4] Production lot-streaming flow shop scheduling problem based on multi-objective optimization algorithm
    Wang, Jinjun
    [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (02): : 124 - 129
  • [5] An improved migrating birds optimization for an integrated lot-streaming flow shop scheduling problem
    Meng, Tao
    Pan, Quan-Ke
    Li, Jun-Qing
    Sang, Hong-Yan
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2018, 38 : 64 - 78
  • [6] Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time
    Han, Yuyan
    Gong, Dunwei
    Jin, Yaochu
    Pan, Quan-ke
    [J]. APPLIED SOFT COMPUTING, 2016, 42 : 229 - 245
  • [7] A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems
    Gong, Dunwei
    Han, Yuyan
    Sun, Jianyong
    [J]. KNOWLEDGE-BASED SYSTEMS, 2018, 148 : 115 - 130
  • [8] A MULTI-OBJECTIVE LOT-STREAMING OPTIMIZATION SCHEDULING MODEL CONSIDERING THE BLOCKING EFFECT
    Li, Y. G.
    Zhang, M. S.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (04) : 731 - 741
  • [9] An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem
    Han, Yu-Yan
    Gong, Dun-wei
    Sun, Xiao-Yan
    Pan, Quan-Ke
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2211 - 2231
  • [10] A Multi-objective Hybrid Discrete Harmony Search Algorithm for Lot-Streaming Flow Shop Scheduling Problem
    Han, Hong-Yan
    [J]. ADVANCED INTELLIGENT COMPUTING THEORIES AND APPLICATIONS: WITH ASPECTS OF ARTIFICIAL INTELLIGENCE, 2012, 6839 : 66 - 73