Developing and Promoting OKP Production System: A JIT Production Planning Approach

被引:0
|
作者
Samavati, Mehran [1 ]
机构
[1] Tabriz Univ, Fac Mech, Dept Ind Engn, Tabriz, Iran
关键词
One-of-a-kind-product (OKP); Just-in-time (JIT); 0-1; programming; Earliness/tardiness production planning; Linear programming; TIME;
D O I
10.1117/12.914385
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The role of production in competitive system of market on one hand and the changing conditions of market on the other hand has caused the need for more developed planning in such environments. The general purpose of the present research is to realize One-of-a Kind- Product model (OKP) that is developed in two stages. In OKP model presented in 1994(1) only one sample of each product is produuced and only one production more production methods, thhe following developments were made in this research: 1-First Development: Considering various methods for producing each product. 2-Second Development: Producing more than one sample of each product, while considering various production methods for each product. These models promoted OKP model of 1994. They can be used in more diversified production methods in order to promote them. In present model, while describing the main OKP model new models are provided as well. The significance of OKP has been described in Introduction.
引用
收藏
页数:4
相关论文
共 50 条
  • [1] JIT production planning approach with fuzzy due date for OKP manufacturing systems
    Wang, W
    Wang, DW
    Ip, WH
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 58 (02) : 209 - 215
  • [2] Capacitated production planning with outsourcing in an OKP company
    Liu, X.
    Tu, Y. L.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (20) : 5781 - 5795
  • [3] A SIMULATION APPROACH FOR TRANSITION TO JIT PRODUCTION SYSTEM
    Kilic, R.
    Erkayman, B.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2021, 20 (03) : 489 - 500
  • [4] A solution approach to a synchronisation problem in a JIT production system
    Gundogar, Emin
    Yilmaz, Aysegul
    Erkayman, Burak
    [J]. PRODUCTION PLANNING & CONTROL, 2014, 25 (12) : 990 - 998
  • [5] STATISTICS AID PLANNING FOR JIT PRODUCTION
    LEWIS, FA
    [J]. CME-CHARTERED MECHANICAL ENGINEER, 1986, 33 (06): : 27 - 30
  • [6] PRODUCTION PLANNING AND CONTROL IN A JIT ENVIRONMENT
    SENGUPTA, S
    DAVIS, RP
    FERRELL, WG
    [J]. APPLIED MATHEMATICAL MODELLING, 1993, 17 (01) : 41 - 46
  • [7] An Establishment and Management System of Production Planning and Scheduling for Large-piece OKP Enterprises
    Min, Lv
    Xiao, Luo
    Ying, Che
    [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 964 - 968
  • [8] Policy and planning: A holistic approach to promoting cleaner production
    Evans, W.
    Stevenson, R.
    [J]. Industry and Environment, 2001, 24 (1-2):
  • [9] PRODUCTION PLANNING IN A MRP/JIT REPETITIVE MANUFACTURING ENVIRONMENT
    SPENCER, MS
    [J]. PRODUCTION PLANNING & CONTROL, 1995, 6 (02) : 176 - 184
  • [10] Dynamic lead time modeling for JIT production planning
    Caramanis, MC
    Anli, OM
    [J]. ICRA '99: IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-4, PROCEEDINGS, 1999, : 1450 - 1455