Heuristic algorithms for scheduling of a batch processor in automobile gear manufacturing

被引:17
|
作者
Gokhale, Ravindra [2 ]
Mathirajan, M. [1 ]
机构
[1] Indian Inst Sci, Dept Management Studies, Bangalore 560012, Karnataka, India
[2] Symbiosis Ctr Management & Human Resource Dev, Pune 411057, Maharashtra, India
关键词
scheduling; batch processor; gear manufacturing; mathematical model; heuristic algorithms; INCOMPATIBLE JOB FAMILIES; TOTAL WEIGHTED TARDINESS; GENETIC ALGORITHM; RELEASE DATES; READY TIMES; MACHINE; SIZES; ARRIVALS; SETUPS;
D O I
10.1080/00207541003720368
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we address a scheduling problem for minimising total weighted tardiness. The motivation for the paper comes from the automobile gear manufacturing process. We consider the bottleneck operation of heat treatment stage of gear manufacturing. Real life scenarios like unequal release times, incompatible job families, non-identical job sizes and allowance for job splitting have been considered. A mathematical model taking into account dynamic starting conditions has been developed. Due to the NP-hard nature of the problem, a few heuristic algorithms have been proposed. The performance of the proposed heuristic algorithms is evaluated: (a) in comparison with optimal solution for small size problem instances, and (b) in comparison with 'estimated optimal solution' for large size problem instances. Extensive computational analyses reveal that the proposed heuristic algorithms are capable of consistently obtaining near-optimal solutions (that is, statistically estimated one) in very reasonable computational time.
引用
收藏
页码:2705 / 2728
页数:24
相关论文
共 50 条
  • [1] HEURISTIC ALGORITHMS FOR TASK ASSIGNMENT AND SCHEDULING IN A PROCESSOR NETWORK
    WU, SS
    SWEETING, D
    [J]. PARALLEL COMPUTING, 1994, 20 (01) : 1 - 14
  • [2] Population-Based Meta-Heuristic Algorithms for Integrated Batch Manufacturing and Delivery Scheduling Problem
    Kim, Yong-Jae
    Kim, Byung-Soo
    [J]. MATHEMATICS, 2022, 10 (21)
  • [3] Heuristic Algorithms for Fowline Cellular Manufacturing System Scheduling
    Li, Yazhi
    Zhu, Xianjun
    Xiao, Fangxiong
    [J]. PROCEEDINGS OF THE 2018 IEEE 22ND INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN ((CSCWD)), 2018, : 779 - 784
  • [4] Modified heuristic algorithms for scheduling multiple batch processors with incompatible job families
    Mathirajan, M
    Chandru, V
    Krishnaswamy, KN
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2001, 18 (01) : 89 - 102
  • [5] A batch scheduling model for m heterogeneous batch processor
    Hidayat, Nita P. A.
    Cakravastia, Andi
    Samadhi, T. M. A. Ari
    Halim, Abdul Hakim
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) : 1170 - 1185
  • [6] Heuristic Scheduling of Batch Production Processes Based on Petri Nets and Iterated Greedy Algorithms
    Zhao, Ziyan
    Liu, Shixin
    Zhou, Mengchu
    You, Dan
    Guo, Xiwang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (01) : 251 - 261
  • [7] Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system
    Parsa, N. Rafiee
    Karimi, B.
    Husseini, S. M. Moattar
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2017, 80 : 173 - 183
  • [8] Novel Heuristic for Low-Batch Manufacturing Process Scheduling Optimisation with Reference to Process Engineering
    Maqsood, S.
    Khan, M. K.
    Wood, A. S.
    [J]. CHEMICAL PRODUCT AND PROCESS MODELING, 2011, 6 (02):
  • [9] A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
    Danneberg, D
    Tautenhahn, T
    Werner, F
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 1999, 29 (09) : 101 - 126
  • [10] Meta-heuristic algorithms for scheduling on parallel batch machines with unequal job ready times
    Fidelis, Michele B.
    Arroyo, Jose Elias C.
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2017, : 542 - 547