An Adaptive Genetic Algorithm to Solve the Single Machine Scheduling Problem with Earliness and Tardiness Penalties

被引:0
|
作者
Ribeiro, Fabio F. [1 ]
de Souza, Sergio R. [1 ,2 ]
Souza, Marcone J. F.
Gomes, Rogerio M. [1 ]
机构
[1] Ctr Fed Educ Tecnol Minas Gerais CEFET MG, Ave Amazonas 7675, BR-30510000 Belo Horizonte, MG, Brazil
[2] Univ Fed Ouro Preto, ICEB, BR-35400000 Ouro Petro, Brazil
关键词
Single machine scheduling; Genetic algorithm; metaheuristics; COMMON DUE-DATE; MINIMIZING EARLINESS; BOUND ALGORITHM; SEARCH; DISTINCT; COSTS;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper deals with the Single Machine Scheduling Problem with Earliness and Tardiness Penalties, considering distinct due windows and sequence-dependent setup time. Due to its complexity, an adaptive genetic algorithm is proposed for solving it. Five search operators are used to explore the solution space and the choice probability for each operator depends on the success in a previous search. The initial population is generated by the combination between construct methods based on greedy, random and GRASP techniques. For each job sequence generated, a polynomial time algorithm are used for determining the processing initial optimal date to each job. During the evolutive process, a group with the best five individuals generated by each crossover operator is built. Then, periodically, a Path Relinking module is applied taking as base individual the best one so far generated by the algorithm and as guide individual each one of the five best individuals generated by each crossover operator. Three variations of this algorithm were submitted to computational experiments. The results shows the effectiveness of the proposal.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] An Adaptive Genetic Algorithm to the Single Machine Scheduling Problem with Earliness and Tardiness Penalties
    Ribeiro, Fabio Fernandes
    Freitas Souza, Marcone Jamilson
    de Souza, Sergio Ricardo
    [J]. ADVANCES IN ARTIFICIAL INTELLIGENCE - SBIA 2010, 2010, 6404 : 203 - 212
  • [2] An Adaptive Genetic Algorithm for solving the Single Machine Scheduling Problem with Earliness and Tardiness Penalties
    Ribeiro, Fabio Fernandes
    de Souza, Sergio Ricardo
    Freitas Souza, Marcone Jamilson
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 698 - +
  • [3] A genetic algorithm for the single machine preemptive scheduling problem with linear earliness and quadratic tardiness penalties
    Rahmani, Keyhan
    Mahdavi, Iraj
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 65 (5-8): : 763 - 770
  • [4] A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties
    Valente, Jorge M. S.
    Goncalves, Jose Fernando
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (10) : 2707 - 2715
  • [5] A genetic algorithm for the single machine preemptive scheduling problem with linear earliness and quadratic tardiness penalties
    Keyhan Rahmani
    Iraj Mahdavi
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 65 : 763 - 770
  • [6] A Single Machine Scheduling Problem with Earliness and Tardiness Penalties using Memetic Algorithm
    Kaweegitbundit, Parinya
    [J]. ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-3, 2011, 314-316 : 2353 - 2357
  • [7] Hybrid Genetic Bees Algorithm applied to single machine scheduling with earliness and tardiness penalties
    Yuce, B.
    Fruggiero, F.
    Packianather, M. S.
    Pham, D. T.
    Mastrocinque, E.
    Lambiase, A.
    Fera, M.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 113 : 842 - 858
  • [8] Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties
    Valente, Jorge M. S.
    Alves, Rui A. F. S.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (11) : 3696 - 3713
  • [9] Single machine scheduling with symmetric earliness and tardiness penalties
    Ventura, JA
    Radhakrishnan, S
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 144 (03) : 598 - 612
  • [10] The impact of lot splitting in a single machine scheduling problem with earliness - Tardiness penalties
    Low, Chinyao
    Yeh, Yuling
    [J]. MANUFACTURING SYSTEMS AND TECHNOLOGIES FOR THE NEW FRONTIER, 2008, : 293 - +